WARNING:
To reduce the risk of electric shock or damage to the equipment:
• Do not disable the power cord grounding plug. The grounding plug is an important safety
feature.
• Plug the power cord into a grounded (earthed) electrical outlet that is easily accessible at all
times.
• To disconnect power to the equipment, unplug the power cord from the power supply.
• Do not route the power cord where it can be walked on or pinched by items placed against it.
Pay particular attention to the plug, electrical outlet, and the point where the cord extends
from the server.
Releasing the cable management arm
Procedure
1.
Remove the cable tie if installed.
2.
Release the cable management arm and then swing the arm away from the rack.
Removing the access panel
WARNING:
To reduce the risk of personal injury from hot surfaces, allow the drives and the internal
system components to cool before touching them.
CAUTION:
To prevent damage to electrical components, take the appropriate anti-static precautions
before beginning any installation, removal, or replacement procedure. Improper grounding can
cause electrostatic discharge.
CAUTION:
Do not operate the server for long periods with the access panel open or removed.
Operating the server in this manner results in improper airflow and improper cooling that can lead to
thermal damage.
34
Removal and replacement procedures
Содержание HPE ProLiant DL180 Gen10
Страница 14: ...14 Customer self repair ...
Страница 15: ...Customer self repair 15 ...
Страница 16: ...16 Customer self repair ...
Страница 17: ...Customer self repair 17 ...
Страница 56: ... Secondary riser cage Slot 4 Slot 5 or 6 56 Removal and replacement procedures ...
Страница 63: ... Secondary riser cage Slot 4 Slot 5 or 6 Removal and replacement procedures 63 ...
Страница 124: ... 24 bay SFF hot plug drive model Fan bay numbering 124 Component identification ...
Страница 129: ...Cable routing SFF drive model Box 1 to type a controller Box 1 to type p controller Cabling 129 ...
Страница 130: ...Box 2 to type a controller Box 2 to type p controller 130 Cabling ...
Страница 131: ...Box 3 to system board Box 3 to type a controller Cabling 131 ...
Страница 132: ...Box 3 to type p controller 8 bay SFF power cable default 132 Cabling ...
Страница 137: ...Mini SAS cable to SAS expander Cabling 137 ...
Страница 139: ... M 2 SSD enablement board installed in secondary riser Cabling 139 ...
Страница 143: ...Cable routing USB 3 0 Cable routing Power supply HPE 500W power supply cabling non hot plug Cabling 143 ...
Страница 144: ...Cable routing Serial port Cable routing iLO Service Port SFF LFF 144 Cabling ...
Страница 146: ... Secondary riser cage Slot 4 Slot 5 or 6 146 Cabling ...
Страница 147: ...Cable routing GPU Color Description Orange GPU power cable Blue Rear 2 bay SFF power cable Cabling 147 ...