Library Operations
59
ESL E-Series Tape Library User’s Guide
Powering off the library
To power off the library:
1. Place the library off-line, see “
Placing the library on-line or off-line
” on
page 58.
The library robotics completes any current commands and then stops.
2. Verify that the OCP display indicates “Off-line” from the
Operations
screen.
3. Verify that the media picker is empty.
4. Verify that no backups are in process.
5. Turn off the power switch located on the front of the library (see
Figure 22
on
page 56).
6. Wait for the library to complete the shutdown process. (This usually takes 30
seconds, but may take up to two minutes.)
7. Open the back door of the library cabinet and flip the breaker switches to the
off position (left). The breaker switches are on the power distribution unit
located on the bottom left side of the library cabinet.
Note:
When powering off the library, ensure that the two breaker switches on the
power distribution unit are in the off (left) position.
Содержание ESL E-Series
Страница 14: ...About this Guide 14 ESL E Series Tape Library User s Guide ...
Страница 42: ...Library Overview 42 ESL E Series Tape Library User s Guide ...
Страница 74: ...Library Operations 74 ESL E Series Tape Library User s Guide ...
Страница 102: ...Library Characteristics 102 ESL E Series Tape Library User s Guide ...
Страница 120: ...Regulatory Statements 120 ESL E Series Tape Library User s Guide BSMI statement ...
Страница 121: ...Regulatory Statements 121 ESL E Series Tape Library User s Guide Japan statement VCCI ...
Страница 128: ...Regulatory Statements 128 ESL E Series Tape Library User s Guide ...
Страница 142: ...Sense Data Values 142 ESL E Series Tape Library User s Guide ...
Страница 152: ...Event Reporting 152 ESL E Series Tape Library User s Guide ...
Страница 158: ...Glossary 158 ESL E Series Tape Library User s Guide ...