HP 85325A Operating and Service Manual 4-1
System Performance Verification
4
System Performance Verification
Introduction
This performance verification should be performed at least once a year.
This procedure verifies that the millimeter subsystem meets or exceeds its
published specifications. Specifications are listed in Chapter 3. If traceability
to a local standards organization is required, then it can be done with this
procedure. One such standards organization is the United States National
Institute of Standards and Technology.
The performance verification is composed of two parts:
•
transmitter verification
•
receiver verification
The transmitter verification should be performed first. This allows the
receiver verification to be run with a transmitter that is known to be within
specifications.
Recommended Test Equipment
The following tables list major instruments required for performing the
millimeter wave measurement system verification. Substitute test
instruments can be used if they meet or exceed the critical specification
shown in the Table 4-1 on page 4-2 and Table 4-2 on page 4-3. “No
substitute” means you must use the listed device. Miscellaneous adapters
and cables are also required, and may not be listed in the tables.
To determine the recommended equipment for testing each of the millimeter
wave system instruments, refer to the manual for that instrument.
Содержание 85325A
Страница 2: ......
Страница 70: ...5 4 HP 85325A Operating and Service Manual Synthesized LO Source Timebase Check and Adjustment ...
Страница 86: ...A 2 HP 85325A Operating and Service Manual Using the HP 8340 41 in Your System ...
Страница 96: ...Index iv HP 85325A Operating and Service Manual ...