Periodic maintenance 68
HP POD 40c G2 structure
Component to be inspected
Task
Frequency
Capable Party
Complete structure
Visually inspect the structural
integrity.
Annually
Certified facilities
personnel
—
Inspect the door operation and
inspect the door gaskets for water
and air leaks.
Annually
Certified facilities
personnel
—
Visually inspect the paint. Perform
prep and touch-up as necessary.
Annually
Certified facilities
personnel
Life safety
Component to be inspected
Task
Frequency
Capable Party
EPO system
EPO functional test with manual
and automatic shutdown. (Verify
all shunt-trips on all panels trip.)
Annually
Licensed EPO safety
contractor
—
EPO alarms
Annually
Licensed EPO safety
contractor
—
EPO bypass keyed switch
(functional test)
Annually
Licensed EPO safety
contractor
—
EPO bypass switch located at
each personnel door. (Functional
test. Verify system time-out reset
when switch is activated.)
Annually
Licensed EPO safety
contractor
—
EPO status light. (Verify operation
in different modes. Replace lamps
as necessary.)
Annually
Licensed EPO safety
contractor
—
Exit lights. (Verify exit lights are
visible when all lighting is off and
POD doors are closed.)
Bi-annually
Certified facilities
personnel
—
Tritium exit signs (Visual
inspection)
Bi-annually
Certified facilities
personnel
—
Personnel door emergency egress
panic bars. (Visual and
operational inspection.)
Bi-annually
Certified facilities
personnel
Security
Component to be inspected
Task
Frequency
Capable Party
System functional test
Visual inspection and operational
test of door access contact
switches
Annually
Certified facilities
personnel
—
Visual inspection and operational
test of door access card readers,
electric strikes, and door release
switches at each personnel door
and/or in each personnel door
panic bar
Annually
Certified facilities
personnel