Configuration Rules:
Note 1
The following Transceivers install into this Switch: (Use #0D1 if switch is CTO)
HP X120 1G SFP LC SX Transceiver
JD118B
HP X120 1G SFP LC LX Transceiver
JD119B
HP X120 1G SFP LC BX 10-U Transceiver
JD098B
HP X120 1G SFP LC BX 10-D Transceiver
JD099B
HP X124 1G SFP LC LH40 1310nm Transceiver
JD061A
HP X120 1G SFP LC LH40 1550nm Transceiver
JD062A
HP X125 1G SFP LC LH70 Transceiver
JD063B
HP X115 100M SFP LC FX Transceiver
JD102B
HP X110 100M SFP LC LX Transceiver
JD120B
HP X110 100M SFP LC LH40 Transceiver
JD090A
HP X110 100M SFP LC LH80 Transceiver
JD091A
HP X120 1G SFP RJ45 T Transceiver
JD089B
Note 3
Localization (Wall Power Cord) required on orders without #B2B, #B2C (PDU Power Cord) . (See Localization
Menu)
REMARK: When Switches/Routers are Factory Racked, Then #B2B, or #B2C should be the Defaulted Power Cable
option on the Switches/Routers.
Note 10
If HP CTO Switch Chassis is selected for Rack Level Integration, Then the Switch needs to integrate (with #0D1)
to the Rack.
Remarks:
Drop down under power supply should offer the following options and results:
Switch/Router/Power Supply to PDU Power Cord - #B2B in North America, Mexico, Taiwan, and Japan or #B2C
ROW. (Watson Default B2B or B2C for Rack Level CTO)
Switch/Router/Power Supply to Wall Power Cord - Localized Option (Watson Default for BTO and Box Level
CTO)"
Enter the following menu selections as integrated to the CTO Model X above if order is factory built.
QuickSpecs
HP 5500 EI Switch Series
Configuration
DA - 13808 North America — Version 27 — January 16, 2014
Page 13