
118
Step Command
Remarks
3.
Configure the switchover delay
for the downlink interfaces in
the monitor link group.
downlink up-delay
delay
By default, the switchover delay is
0 seconds. The downlink
interfaces come up as soon as an
uplink interface comes up.
Displaying and maintaining Monitor Link
Execute the
display
command in any view:
Task Command
Display monitor link group information.
display monitor-link group
{
group-id
|
all
}
Monitor Link configuration example
Network requirements
As shown in
:
•
Device C is a Smart Link device, and Device A, Device B, and Device D are associated devices.
Traffic of VLANs 1 through 30 on Device C is dual-uplinked to Device A through a smart link group.
•
Implement dual uplink backup on Device C. When the link between Device A and Device B (or
Device D) fails, Device C can detect the link fault and perform uplink switchover in the smart link
group.
For more information about Smart Link, see "
Figure 28
Network diagram
Configuration procedure
1.
Configure Device C:
# Create VLANs 1 through 30.
<DeviceC> system-view
[DeviceC] vlan 1 to 30
# Map these VLANs to MSTI 1.
Device A
Device D
Device B
GE
1/0
/1
GE
1/0
/2
GE
1/0
/1
GE
1/0
/1
GE
1/0
/2
GE
1/0
/2
Device C
GE
1/0
/1
GE
1/0
/2
Содержание 5130 EI Switch Series
Страница 6: ...iv Related information 145 Documents 145 Websites 145 Conventions 146 Index 148 ...
Страница 128: ...122 Member Role Status GE1 0 1 UPLINK DOWN GE1 0 2 DOWNLINK DOWN ...
Страница 171: ...165 ...