43
Index
A
AC input voltage specifications,
Accessing Hewlett Packard Enterprise Support,
Accessing the IRF fabric to verify the
configuration,
Accessing updates,
Attaching the mounting brackets to the switch
chassis,
C
Chassis dimensions and weights,
Chassis views,
Cleanliness,
Configuration terminal problems,
Configuring basic IRF settings,
Connecting the AC power cord,
Connecting the console cable,
Connecting the console cable,
Connecting the physical IRF ports,
Connecting the power cord,
Connecting the switch to a
–52 to –55 VDC output
RPS,
Console cable,
Console port,
Conventions,
Cooling system,
Customer self repair,
D
Documentation feedback,
E
EMI,
Environmental specifications,
Examining the installation site,
G
Grounding the switch,
Grounding the switch by using the AC power cord,
Grounding the switch with a grounding conductor
buried in the earth ground,
Grounding the switch with a grounding strip,
I
Identifying physical IRF ports on the member
switches,
Identifying the master switch and planning IRF
member IDs,
Installation accessories XE "installing:accessories"
XE "accessories needed for installation" ,
Installation tools,
Installing the switch in a 19-inch rack,
IRF fabric setup flowchart,
L
Laser safety,
LEDs,
M
Mounting brackets and mounting positions,
Mounting the switch on a workbench,
N
Network topology icons,
P
Planning IRF fabric setup,
Planning IRF fabric size and the installation site,
Planning IRF topology and connections,
Planning the cabling scheme,
Port mode LED,
Ports,
Ports,
Power consumption specifications for non-PoE
switches,
Power consumption specifications for PoE
switches,
Power input types,
Power LED,
Power specifications,
Power supply failure,
Powering on the switch,
R
Rack-mounting the switch,
Remote support,
RPS DC input voltage specifications and RPS
compatibility,
RPS status LED,
S
Safety recommendations,
Setting terminal parameters,
Setting up the configuration environment,