i
Contents
Preparing for installation ··································································· 1
Installing the switch·········································································· 6
–52 to –55 VDC output RPS ··························································· 15
Accessing the switch for the first time ················································· 17
Setting up an IRF fabric ··································································· 19
Maintenance and troubleshooting ······················································ 24
Appendix A Chassis views and technical specifications ·························· 26