2-7
Troubleshooting
T
rou
bl
esh
o
ot
in
g
Running Connectivity Tests
Both the hub and cabling can be tested by running an end-to-end communica-
tions test—a test that sends known data from one network device to another
through the hub—such that you can verify that the data was correctly trans-
mitted between the devices. Through both the ASCII Console Interface and
the Browser Interface, you can run the following hub-to-node connectivity
tests:
Link Test.
A test of the link layer (MAC Address) connection between a local
device and a designated remote device.
Ping Test.
A test of the network layer (IP Address) path between the managed
device and another device on an IP network that responds to IP packets.
Figure 2-2. Running a Connectivity Test
See your LAN adapter’s manual for information on running an end-to-end
communication test.
PC responding to
the test packets
PC sending
test packets
,QVWDOOEN3DJH0RQGD\2FWREHU30
Содержание 10Base-T 24
Страница 2: ... QVWDOO EN 3DJH 0RQGD 2FWREHU 30 ...
Страница 3: ...HP ProCurve 10Base T Hubs Installation Guide QVWDOO EN 3DJH L 0RQGD 2FWREHU 30 ...
Страница 50: ... QVWDOO EN 3DJH 0RQGD 2FWREHU 30 ...
Страница 53: ... QVWDOO EN 3DJH 0RQGD 2FWREHU 30 ...