![Hoymiles HY3 Series Скачать руководство пользователя страница 25](http://html1.mh-extra.com/html/hoymiles/hy3-series/hy3-series_user-manual_2171465025.webp)
7. Operating the Inverter
User Manual
MANUAL-HY3-EN-V1.00
23
7.2
Commission
Before commissioning the inverter, make sure:
The country mark on the box is in accordance with the installation site;
The inverter is correctly and firmly mounted;
The c
ircuit breaker and RCD are correctly connected and are all in “off” position;
All cables are connected according to chapter 6;
Unused inputs must be sealed using the corresponding connectors or sealing plugs.
Procedure
Step 1
Power on the grid
Wait for a while, the status led should be on.
If not, power off the grid and check for the connections of grid
power line and smart meter.
Step 2
Power on the battery
The battery SOC indicator should be on, and show the current
SOC.
If not, power off the battery and check for the power connection
and BMS communication.
Also check the battery
’
s SOC. If the SOC is too low, the battery may
be in the sleep mode, and even cannot be power on.
Step 3
Power on the PV
If there’s sunlight, the
outer cycle indicator will be on according to
PV power.
Wait for a moment and the inverter will start a self-test procedure.
When it is done successfully, the inverter will start using PV power to
charge the battery or feed in power to the house and grid.
Step 4
Switch on the loads
Make sure all the loads are ready to be powered on.
Step 5
Configure network for
WiFi module
Configure WiFi module via Hoymiles APP for remote monitoring.
! WARNING
Содержание HY3 Series
Страница 1: ...USER MANUAL HY3 Series Hybrid Inverter EN Version MANUAL HY3 EN V1 00 www hoymiles com...
Страница 2: ......
Страница 29: ...8 Troubleshooting User Manual MANUAL HY3 EN V1 00 27 8 Troubleshooting To be released...
Страница 33: ...NOTE PAGE...
Страница 34: ...NOTE PAGE...
Страница 35: ......