background image

1

Rev. 5/8/2014

DTDU

LED Dusk-to-Dawn

Utility-grade

INSTALLATION INSTRUCTIONS

For models:

DTDU-48-LED-41-MV

This model number does not include a mounting arm, photoelectric control.

Warning

Please read instructions carefully before 

attempting to install fixture and retain instructions 

for future reference.

Caution: To avoid electrical shock hazard.

• 

Turn off the electricity before installing or 

servicing this fixture.

• 

Electrical connections need to comply with 

National Electric Code and Local Electric Code.

• 

The fixture should be installed by a qualified 

electrician.

General Safety Information

1.  Disconnect power during installation and 

before servicing.

2.  Risk of Fire: Product is for outdoor installation 

and use only.

3.  To avoid the risk of fire or shock, this fixture 

must be wired in accordance with the National 

Electric Code and applicable local codes or 

ordinances.

4.  All work should be performed by a qualified 

electrician.

5.  To ensure personal safety, proper grounding is 

required.

6.  Do not touch the yellow portion of the LED 

when removing the acrylic refractor. Damage 

may occur.

WALL MOUNTING

Note: Assure that fixture is mounted to a structurally 

sound surface that will support the fixture. 
1.  Select a location on a structurally secure wall or 

pole, minimum 4 feet from the ground.

2.  Place mounting section of fixture onto desired 

mounting surface, mark and drill holes for 

mounting.

3.  This fixture can be mounted with three lag screws 

which are provided. (Fig. 1, #14).

4.  Install the two bottom lag screws first.
5.  Place the fixture on the two bottom lag screws and 

install the top lag screw.

6.  Tighten the top lag screw first and then tighten the 

remaining lag screws.

FIXTURE WIRING/INSTALLATION

Note: Connect fixture to supply wires, make sure power 

is off.
1.  Press stainless steel springs (Fig. 1, #22) outward to 

release cover plate (Fig. 1, #24).

2.  Feed supply wires through arm and make wiring 

connections in the fixture.

3.  Connect the incoming power lead wires to terminal 

block (Fig. 1, #13) black to black and white to white. 

Route lead wires through mounting arm, form a drip 

loop, and connect lead wires to power source.

4.  Ensure that the power supply voltage and luminaire 

voltage ratings match.

5.  The fixture must be grounded. Attach ground lead to 

ground lug on terminal block (Fig. 1, #13). 

6.  For wall mount applications, secure the wall mount 

cover plate (Fig. 1, #20) by removing the fitter clamp 

(Fig. 1, #21), inserting wall mount cover plate (Fig. 

1, #20), inverting the fitter clamp (Fig. 1, #21), and 

securing with two lock washers (Fig. 1, #36) and two 

screws (Fig. 1, #10). 

7.  Install shorting cap (Fig. 1, #1) or photoelectric 

control by inserting plug into receptacle and twist 

until locking in position. Ensure Photocontrol is rated 

for the same voltage as the luminaire.

Содержание DTDU-35LED-41-MV

Страница 1: ...um 4 feet from the ground 2 Place mounting section of fixture onto desired mounting surface mark and drill holes for mounting 3 This fixture can be mounted with three lag screws which are provided Fig 1 14 4 Install the two bottom lag screws first 5 Place the fixture on the two bottom lag screws and install the top lag screw 6 Tighten the top lag screw first and then tighten the remaining lag scre...

Страница 2: ...cell socket Top 1 Screws 9 Top Cover 1 Photocell socket Bottom 1 Gasket 1 Screws 5 Driver 1 10 Screws 2 11 Housing 1 12 Water gasket 1 13 Terminal block 1 14 Lag screw 3 15 Heat shrink sleeve 1 16 MOV 3 17 Thermal fuse 1 18 Cable 3 19 PCB 1 20 Wall mount cover plate 1 21 Fitter clamp 1 22 Stainless spring 2 23 Screw with washer 3 24 Cover plate 1 25 Tether cord 1 26 Acrylic refractor 1 27 Gasket 1...

Страница 3: ... 4 feet from the ground 2 Place mounting section of fixture onto desired mounting surface mark and drill holes for mounting 3 This fixture can be mounted with three lag screws which are provided Fig 1 14 4 Install the two bottom lag screws first 5 Place the fixture on the two bottom lag screws and install the top lag screw 6 Tighten the top lag screw first and then tighten the remaining lag screws...

Страница 4: ... 1 4 Screws 9 5 Top Cover 1 6 Photocell socket Bottom 1 7 Gasket 1 8 Screws 6 9 Driver 1 10 Screws 2 11 Housing 1 12 Water gasket 1 13 Terminal block 1 14 Lag screw 3 15 Heat shrink sleeve 1 16 MOV 3 17 Thermal fuse 1 18 Cable 3 19 PCB 1 20 Wall mount cover plate 1 21 Fitter Clamp 1 22 Stainless spring 2 23 Screw with washer 3 24 Cover plate 1 25 Tether cord 1 26 Acrylic refractor 1 27 Gasket 1 28...

Отзывы: