
5 Transport and installation
Caution
Risk of injury from incorrect handling. Transport, assembly and installation
work may only be performed by specialists. Observe safety and accident
prevention regulations.
5.1 Delivery
TopVent
®
TV units are packed in cardboard boxes and delivered on a pallet.
■
The scope of delivery includes:
–
Recirculation unit heater
–
Suspension set
–
Accessories for installation
■
Ensure that the unit is undamaged.
■
Report any missing parts, wrong deliveries and possible transport damage
immediately in writing.
5.2 Requirements for the installation site
■
Position the units according to the system layout. Comply with the minimum
and maximum distances.
■
All air inlet and air outlet openings must be freely accessible. The supply air jet
must be free to spread out unhindered.
X
Y
X
≥
0.4 m
Y
Size
TV-2
TV-4
TV-5
Distance X
m
3 … 7
6 … 12
6 … 12
Distance Y
m
2.5 … 5.5
2.5 … 5.5
2.5 … 5.5
Minimum distance to the ceiling/wall
m
0.4
0.4
0.4
Table 7: Minimum and maximum distances
Fig. 3: Examples of unit arrangement for wall installation (top view)
TopVent
®
TV
Transport and installation
Art.No. 4 216 284-en-01 / Page 9
Содержание TopVent TV
Страница 18: ...Art No 4 216 284 en 01 Page 18 ...
Страница 19: ...Art No 4 216 284 en 01 Page 19 ...