
6 Operation
6.1 Initial commissioning
Caution
Risk of damage to property as a result of performing initial commissioning
on your own authority. Initial commissioning must be performed by the
manufacturer's customer service technicians .
Preparing for initial commissioning:
Checklist:
■
Have all the media connections been made (electric cabling and water piping)?
■
Is the heating medium available?
■
Are the hydraulics aligned and balanced?
■
Are all the control components installed and wired?
■
Are all of the respective trade groups (installer, electrician, etc.) present at the
scheduled time?
■
Are the system operating personnel present for training at the scheduled time?
6.2 Operation
The system runs automatically according to the programmed room temperature
and the door contact switch.
■
Observe the operating instructions for the control system.
■
Ensure free air outlet and unhindered dispersion of the supply air.
■
If necessary, the air outlet direction can be adjusted manually:
–
Hold the vanes of the air outlet louvre at both ends and turn them in the
required direction.
TopVent
®
TV
Operation
Art.No. 4 216 284-en-01 / Page 15
Содержание TopVent TV
Страница 18: ...Art No 4 216 284 en 01 Page 18 ...
Страница 19: ...Art No 4 216 284 en 01 Page 19 ...