Configuration and connection diagram for the Belaria
®
fit
The piping from the boiler room to the heat
pump must be configured by the installer.
Connecting pipes are not included.
1
Heating flow DN 50
2
Heating return DN 50
3
Electrical system feed-through
4
Control module bracket (installation possible on site)
5
Vibration dampers (option)
6
Concrete base (on site)
7
Vibration decouplers (on site)
8
Victaulic coupling (included in the scope of delivery)
9
Victaulic connection pipe (included in the scope of delivery)
10
Set of welded-on flanges (option)
11
Vibration decouplers (option)
12
Hydraulic line (on site)
13
Insulation (on site)
14
Feed-throughs (on site)
15
Main current
400 V/5-pin (configuration of cross-section on site)
16
Connection to heat pump
Request On/Off
230 V/2-pin (see wiring diagram)
Cooling mode On/Off
230 V/2-pin (see wiring diagram)
Alarm
230 V/2-pin (see wiring diagram)
17
Operator terminal
18
Connection of heat pump operator terminal
(on-site
line length < 40 m: 5 x 0.75 mm
2
shielded
line length < 300 m: 3 x 0.75 mm
2
shielded)
19
Electrical box
20
Control current
230 V/13 A/3-pin (see wiring diagram)
Kiesbett
5
6
7
8
11
12
13
14
19
17
3
3
3
3
2
1
4
Belaria® fit
9
10
20
16
10
5
11
15
18
Belaria
®
fit
Gravel bed
78
4 221 546 / 00
GEnERal TECHnICal DaTa
Содержание Belaria fit 53