16
4 220 456 / 02
IMPORTANT NOTICES
5.
Route all cables (a-h, Fig. 09/Fig. 10) and establish
plug-in connections (wiring in accordance with Fig. 09
- Cables passing through one of the two cable ducts
(1.1/1.2) must be inserted through the openings at
the bottom of the terminal plate (3c, Fig. 13).
- Fix cables to a strain relief strap.
CAUTION
The cables must not touch any hot parts.
• All cables must be routed through the cable
ducts.
6. Installing the electrical box (4):
NOTICE
Make sure that the electrical box is not
scratched by the climbing aid.
- Hold the electrical box (4) horizontally against the
boiler.
- The recesses (4a) on the left and right of the base
of the electrical box must point towards the lower
two studs (4b) on the side of the terminal plate (3).
4
4b
4b
4a
3c
3c
Fig. 13
-
Move the electrical box (4) forwards so that the
heads of the two lower studs (4b) end up in the two
recesses (4a).
- Then pull the electrical box (4) downwards so that
the studs (4b) hook into the recesses (4a).
- Attach one safety cord (4c) each on the inside left
and inside right of the electrical box.
4d
4c
4c
Fig. 14
- Fold the electrical box closed upwards, lift it and
hook it in, then secure with the screw (4d).
7. Installing rear wall:
5b
6b
6a
5a
5
6b
6.2
6.1
6c
Fig. 15
- Hook the lowest rear wall section (5) with the side
recesses (5a) onto the corresponding screw heads
(5b) of the side walls.
- Installing the rear wall section (6.1):
Press the pin of the rear wall section (6.1) into the
snap lock of the corresponding side wall and let it
engage (6a).
Содержание 51-UltraGas 2 1000
Страница 65: ...65 4 220 456 02 ...