background image

23 

a. Lower Float Switch 1st Activation: Refill 

– The refill can occur at any time during the 

freeze cycle (1 refill per cycle). As ice builds the water level drops in the reservoir and the 
lower float switch activates (opens). LED 5 comes on and the control board energizes the fill 
water valve. The fill water valve remains energized until the upper float switch closes or the 
1 minute fill timer terminates, whichever comes first. 
 

b. Lower Float Switch 2nd Activation: 

The unit is held in freeze by a 5 minute short cycle 

protection timer which starts after the thermistor temperature reaches 2°C. After the 1st 
lower float switch activation and refill, ice continues to form and the water level drops in 
the  reservoir.  When  the  lower  float  switch  activates  (opens)  a  second  time,  the  freeze 
cycle terminates (freeze can only be terminated on the second activation of the lower float 
switch  and  after  the  minimum  freeze  period). 

Diagnosis: 

During  the  minimum  freeze 

period, confirm that the evaporator temperature drops, compressor, fan motors and pump 
motor are energized and that the hot gas valves, harvest water valve and fill water valve 
(except  during  refill)  are  de-energized  and  not  bypassing.  Make  sure  the  expansion 
valves are operating properly and, in cold conditions. Make sure that the drain water valve 
is not leaking by (water flowing down the potable drain). Check for proper unit pressures, 
or an inoperative compressor. Disconnect the 3-pin float switch connector from the control 
box.  15  seconds  after  disconnecting  the  3-pin  float  switch  connector,  LED  5  comes  on 
and refill begins. Connect the 3-pin float switch connector back on the control box. When 
the refill is finished (LED 5 goes off), disconnect the 3-pin float switch connector again. If 5 
or more minutes have elapsed in the freeze cycle, the unit should switch out of the freeze 
cycle. After the unit switches out of freeze, reconnect the 3-pin float switch connector to 
the control box. If the unit remains in freeze with the float switch disconnected, replace the 
board. To check the float switch, see "II. 5. [c] FLOAT SWITCH CHECK PROCEDURE." 

 
Note:   

1. Normal freeze cycle will last 20 to 40 minutes depending on model and conditions. 

Cycle times and pressures should follow performance data provided in this manual.   

 
2. The refill counter is deactivated before shipping. 

 
6) Drain Cycle – The compressor remains energized, the hot gas valve energizes, the fan 

motor de-energizes. The drain valve and pump motor energize, allowing water to drain 
from  the  tank  for  20  seconds.  This  removes  contaminants  from  the  water  tank. 

Diagnosis: 

If the drain valve does not open, check the circuit. Check for proper voltage. If 

water does not drain out, check and clean the tubing at the drain valve and then check 
and clean the valve assembly. 

 
7) Normal Harvest Cycle – same as the initial harvest cycle – Return to step 4. 
 
Note: Unit continues to cycle until bin control is satisfied or power is turned off. (The drain 

cycle can be adjusted to occur every cycle, or every 2, 5, or 10 cycles. The factory 
default is every 10 cycles.) The unit always restarts at the 1 minute fill cycle.

 

 

 

 

 

 

 

Содержание KMD-210AB-HC

Страница 1: ...F138 1074 072020 SERVICE MANUAL MODULAR CRESCENT CUBER KMD 210AB HC...

Страница 2: ...CHECK PROCEDURE 16 6 BIN CONTROL 17 a EXPLANATION OF OPERATION 17 b BIN CONTROL CHECK PROCEDURE 17 7 SWITCHES 18 a CONTROL SWITCH 18 b SERVICE SWITCH 18 III TECHNICAL INFORMATION 19 1 WATER CIRCUIT A...

Страница 3: ...NTROL SERVICE SWITCH 48 b FUSE 48 c FUSE HOLDER 48 d CONTROL BOARD 48 e MAGNETIC CONTACTOR 48 f CONTROL BOARD TRANSFORMER 48 g STARTER 49 h RUN CAPACITOR 49 i START CAPACITOR 49 j CAPACITOR FOR PUMP M...

Страница 4: ...1 I SPECIFICATIONS 1 DIMENSIONS SPECIFICATIONS...

Страница 5: ...Water Supply Inlet Water Tank Cube Guide Pump Motor Float Switch Condenser Fan Motor Hot Gas Valve Compressor Control Box Expansion Valve Harvest Water Valve Fill Water Valve Control Switch Service Sw...

Страница 6: ...30 or 50 seconds of harvest depending on S1 dip switch 7 8 setting LED 7 comes on when PM energizes At the end of harvest the control board checks the position of LF S and proceeds to the freeze cycl...

Страница 7: ...le if it is closed or calls for a 1 minute fill if it is open The unit continues to cycle through c d and e sequence until the bin control is activated and shuts the unit down When the bin control is...

Страница 8: ...dip Switch 5 6 Pump motor stops for 2 sec and then runs for 10 20 sec S1 dip switch 3 4 0 0 30 or 50 sec HWV energized COMP energized HGV energized HWV continues FWV de energized DV de energized COMP...

Страница 9: ...ed circuits which are susceptible to failure due to static discharge It is especially important to touch the metal part of the unit when handling or replacing the board 3 Do not touch the electronic d...

Страница 10: ...7 a CONTROL BOARD LAYOUT 4 Harvest Water Valve 5 Freeze Water Valve 1 2 3 Float Switch P01771 02 Control Board Model KMD 210AB HC Part Number P01771 02 Type HKM2006V003...

Страница 11: ...ater Safety The control board checks the position of the lower float switch at the end of the initial one minute water fill cycle and at the end of each harvest cycle If the lower float switch is in t...

Страница 12: ...sec factory default setting Note The refill counter is deactivated before shipping The built in safeties shut down the unit and have alarms as listed below No of Beeps every 3 sec Type of Alarm Notes...

Страница 13: ...d on program version S2 Dip Switch No 1 2 3 4 5 6 KMD 210AB HC ON OFF OFF OFF ON OFF Do not adjust the S2 dip switch These must be left in the factory default position or the unit will not operate pro...

Страница 14: ...rol The drain frequency control is factory adjusted to drain the water tank every 10 cycles and no adjustment is required However where water quality is bad and the icemaker needs a drain more often t...

Страница 15: ...Motor Delay S2 dip switch 1 The pump out pump motor delay determines whether or not the pump motor de energizes for 2 seconds before restarting at the beginning of a drain cycle The pump out pump mot...

Страница 16: ...he thermistor detects the temperature of the evaporator outlet to find overfreeze in a harvest cycle and at the beginning of a freeze cycle If the difference between the maximum temperature after the...

Страница 17: ...a control board that does not show a visible defect and that you suspect is bad always conduct the following check procedure This procedure will help you verify your diagnosis 1 Check the dip switch s...

Страница 18: ...ing located on the suction line next to the evaporator outlet Temperature F Temperature C Resistance k 0 18 14 401 10 12 10 613 32 0 6 000 50 10 3 871 70 21 2 474 90 32 1 633 Check a thermistor for re...

Страница 19: ...solution See VI CLEANING AND MAINTENANCE INSTRUCTIONS c FLOAT SWITCH CHECK PROCEDURE Before replacing a float switch that you suspect is bad make sure the float switch has been cleaned This procedure...

Страница 20: ...the machine to complete the freeze cycle and the following harvest cycle before shutting down the machine b BIN CONTROL CHECK PROCEDURE 1 Clear any ice away from the bin control 2 Make sure the contro...

Страница 21: ...m two functions draining the tank DRAIN lower position and washing the icemaking compartment WASH or CIRCULATE upper or center position Both the WASH and CIRCULATE positions activate the same function...

Страница 22: ...19 III TECHNICAL INFORMATION 1 WATER CIRCUIT AND REFRIGERANT CIRCUIT...

Страница 23: ...20 2 WIRING DIAGRAM...

Страница 24: ...E HARVEST CYCLE INCLUDING DRAIN BIN FULL FREEZE CYCLE FREEZE CYCLE FREEZE CYCLE HARVEST CYCLE INITIAL ON OFF 9 C 5 C Program Ver3 1 THERMISTOR COMPRESSOR ON OFF ON HARVEST CYCLE Thermistor senses 9 C...

Страница 25: ...t fails to start harvest check for open float switch or bad 1 minute timer in board 4 Initial Harvest Cycle The harvest water valve remains energized contactor coil energizes to start the compressor a...

Страница 26: ...tch connector from the control box 15 seconds after disconnecting the 3 pin float switch connector LED 5 comes on and refill begins Connect the 3 pin float switch connector back on the control box Whe...

Страница 27: ...re f High Pressure Control 1 Bad contacts 1 Check for continuity and replace 2 Dirty air filter or condenser 2 Clean 3 Ambient or condenser water temperature too warm 3 Reduce temperature 4 Refrigeran...

Страница 28: ...d through f below 1 Loose terminal 1 Tighten or replace 2 Voltage 2 Check and correct 3 Dirty condenser 3 Clean d Starter 1 Bad contacts 1 Check and replace 2 Coil winding opened 2 Replace e Compresso...

Страница 29: ...l or Harvest Water Valve 1 Water valve is wide open during freeze 1 Check for water leaks with icemaker off f Expansion Valve 1 Operating erratically 1 Check and replace g Headmaster C P R remote air...

Страница 30: ...f position 2 Place in position b Water System 1 Dirty 1 Clean 2 Water supply line too small requires 3 8 OD line dedicated per machine 2 Increase water line size 3 Water filter flow rate too small 3 R...

Страница 31: ...irty 1 Clean c Water Quality 1 High hardness or contains impurities 1 Install a water filter or softener e OTHER PROBLEM POSSIBLE CAUSE REMEDY 1 Icemaker will not stop when bin is filled with ice a Bi...

Страница 32: ...rier designed for R290 3 Handling of Handy Flux R290 Brazing is needed to connect the refrigeration circuit pipes It is no problem to use the same handy flux that has been used for the current refrige...

Страница 33: ...to outdoors atmosphere without risk to the environment Recovery should only be considered if the unit cannot be taken outdoors to evacuate the circuit If R290 is recovered in a refrigerant recovery c...

Страница 34: ...g line and cap off the access valve 9 Always cap the access valves to prevent a refrigerant leak 10 Always thoroughly leak test all joints and valve caps 11 Avoid charging large quantities of liquid i...

Страница 35: ...ier until after all other repair or replacement has been made 1 Turn off the power supply 2 Remove the panels and water tank See V 14 WATER TANK 3 Remove the refrigerant from the unit and then any res...

Страница 36: ...ealed refrigeration system is opened Do not replace the drier until after all other repair or replacement has been made 1 Turn off the power supply 2 Remove the panels 3 Remove the refrigerant from th...

Страница 37: ...CIRCUIT 4 Disconnect the hot gas valve leads 5 Remove the screw and the solenoid coil 6 Remove the valve and drier using brazing equipment 7 Braze the new hot gas valve with nitrogen gas flowing at a...

Страница 38: ...ngs while purging with nitrogen gas flowing at a pressure of 20 to 30 kPa WARNING Always protect the valve body by using a damp cloth to prevent the valve from overheating Do not braze with the valve...

Страница 39: ...pop rivets securing the evaporator then lift out the evaporator 7 Install the new evaporator 8 Remove the drier then place the new drier in position 9 Braze all fittings while purging with nitrogen ga...

Страница 40: ...re it in an approved container 7 Disconnect the capillary tube at the condenser outlet 8 Disconnect the flare connections of the valve 9 Remove the screws and the valve from the bracket 10 Install the...

Страница 41: ...er range See the figure below Next check that the reference pressure is in the range indicated in the Head Pressure table in the Performance Data section If it is not in the proper range verify the re...

Страница 42: ...f the pump motor lead 4 Remove the thumbscrew securing the pump motor 5 Remove the hose band connecting the discharge hose 6 Slide the pump motor at right slightly and lift it up towards you Screw Fan...

Страница 43: ...lose the washer 5 Disconnect the terminals from the valve 6 Remove the bracket and valve from the unit 7 Install the new valve Replace the removed parts in the reverse order of which they were remove...

Страница 44: ...2 Loosen the two thumbscrews securing the pump motor bracket 3 Move the control switch to the SERVICE position Move the service switch to the DRAIN position 4 Let the icemaker run for 2 minutes 5 Mov...

Страница 45: ...the panels in their correct positions 11 Turn on the power supply 15 FLOAT SWITCH 1 Remove the pump motor bracket See V 14 WATER TANK 2 Pull up the pump motor bracket from the water tank 3 Flip over t...

Страница 46: ...IN CONTROL SWITCH CAUTION Do not drop or impact the bin control switch The reed switch inside may be damaged 1 Remove the water tank See V 14 WATER TANK 2 Disconnect the connector of the bin control s...

Страница 47: ...ise ice may get between gaps and damage the bin control 8 Pull up any slack in the bin control lead then put the bushing attached to the bin control lead back into the hole in the base 9 Connect the b...

Страница 48: ...m the suction pipe surfaces 7 Press a tube of the sealant KE4560RTV manufactured by Shin Etsu Silicones to the recess of the thermistor holder Slowly squeeze the sealant out of the tube and spread it...

Страница 49: ...l 3 Remove the one mounting screw and pull the control box cover 4 Remove the two mounting screws and pivot the control box to the left side slightly and pull the control box towards you if needed 5 R...

Страница 50: ...ecially make sure that the harness does not press the push buttons on the control board Control Box Cover Control Box Screw Screws Control Board Control Switch Service Switch Fuse Fuse Holder Starter...

Страница 51: ...e four board supports secured to the control box to release the control board 3 Install the new control board in the reverse order of the removal procedure 4 Check the dip switch for proper setting 5...

Страница 52: ...in the reverse order of the removal procedure 3 To prevent miswiring check the terminal numbers and lead wire colors with the wiring label i START CAPACITOR 1 Disconnect the terminals on the starter...

Страница 53: ...ay tube to release the spray tube 5 Pull the spray tube towards you 6 The spray tube is easily cleanable by removing the black rubber caps on the ends 7 Remove the hose band connecting the water suppl...

Страница 54: ...n the reverse order of the removal procedure Check for water leaks IMPORTANT Fit the spray guide securely and tightly on the evaporator fin Otherwise cloudy or irregular ice cubes or performance reduc...

Страница 55: ...RVICE position for extended periods of time when the water tank is empty a CLEANING PROCEDURE 1 Dilute approximately 9 5 fl oz 281 ml of recommended cleaner Hoshizaki Scale Away or LIME A WAY Economic...

Страница 56: ...connector from the side of the control box d Keep pushing up the snap tab at the right side of the pump motor bracket e Pull out the water tank cube guide pump motor bracket pump motor and float swit...

Страница 57: ...nutes 17 Turn off the power supply and remove the front panel 18 Move the control switch to the ICE position 19 Replace the front panel in its correct position 20 Turn on the power supply to fill the...

Страница 58: ...nel in their correct positions 6 Turn on the power supply to start the sanitizing process 7 Turn off the power supply after 15 minutes 8 Remove the front panel 9 Move the service switch to the DRAIN p...

Страница 59: ...icemaker s performance will be reduced Check the filters at least twice a month When clogged use warm water and a neutral cleaner to wash the filters d CONDENSER AIR COOLED MODEL ONLY Check the conden...

Страница 60: ...drain valve 9 Allow the line to drain by gravity 10 Attach compressed air or carbon dioxide supply to the condenser water supply line drain valve 11 Blow the condenser out using compressed air or car...

Страница 61: ...place the front panel in its correct position and turn on the power supply for 2 minutes 4 Turn off the power supply and remove the front panel 5 Move the control switch to the OFF position 6 Replace...

Отзывы: