50
7) Braze the new Hot Gas Valve with nitrogen gas flowing at a pressure of 0.2 - 0.3 bar.
WARNING
Always protect the valve body by using a damp cloth to prevent the valve
from overheating. Do not braze with the valve body exceeding 135°C.
8) Install the new Drier (see “V. 4. DRIER”).
9) Check for leaks using nitrogen gas (10 bar) and soap bubbles.
10) Evacuate the system and charge it with refrigerant (see “V. 1. [c] EVACUATION AND
RECHARGE”).
11) Attach the Solenoid Coil to the valve body, and secure it with the screw.
12) Connect the lead wires.
13) Refit the panels in their correct positions.
14) Plug in the icemaker or connect the power source.
Содержание KM-40B
Страница 1: ...KM 40B KM 55B KM 80B SELF CONTAINED CRESCENT CUBER SERVICE MANUAL F120 1011 073117 ...
Страница 5: ...1 I SPECIFICATIONS 1 DIMENSIONS SPECIFICATIONS a KM 40B Europe ...
Страница 6: ...2 b KM 40B Singapore ...
Страница 7: ...3 c KM 40B Australia New Zealand ...
Страница 8: ...4 d KM 40B Philippines ...
Страница 9: ...5 e KM 55B Europe ...
Страница 10: ...6 f KM 55B Singapore ...
Страница 11: ...7 g KM 55B Australia New Zealand ...
Страница 12: ...8 h KM 55B Philippines ...
Страница 13: ...9 i KM 80B Europe ...
Страница 14: ...10 j KM 80B Singapore ...
Страница 15: ...11 k KM 80B Australia New Zealand ...
Страница 16: ...12 l KM 80B Philippines ...
Страница 22: ...18 ...
Страница 37: ...33 2 WIRING DIAGRAM a KM 40B Philippines b KM 40B Except Philippines KM 55B ...
Страница 38: ...34 c KM 80B ...