41
Sanitizing Rinse 3
25) Turn the cleaning valve to the right until completely horizontal (closed). Move the control
switch to the "ICE" position, then replace the front panel. After 3 min., remove the front
panel, then move the control switch to the "OFF" position.
26) Turn the cleaning valve to the left until completely vertical (open). Move the control
switch to the "WASH" position, then replace the front panel. After 5 min., remove the
front panel, then move the control switch to the "OFF" position.
27) Remove the front insulation panel, then remove the drain plug. After the water tank has
drained, replace the drain plug and front insulation panel.
28) Clean the dispenser unit/ice storage bin liner using a neutral cleaner. Rinse thoroughly
after cleaning.
29) Turn the cleaning valve to the right until completely horizontal (closed), then move the
control switch to the "ICE" position. Note: If on a dispenser unit, turn on the dispenser
unit power supply.
30) Replace all panels in their correct positions.