9
B. Sequence of Operation
The steps in the sequence are as outlined below.
1. Startup
When the power switch is in the "ON" position, the cabinet temperature is displayed
and cabinet cooling begins. When the power switch is in the "ON" position and the rail
cooling switch is moved to the "NORMAL" or "LOW" position, the rail temperature is
displayed and rail cooling begins. The "NORMAL" rail switch position is designed for use
when the rail cover is open. The "LOW" rail switch position is designed for use when the
rail cover is closed. For further details, see "II.D.4.a) Switch Settings."
a) Power Switch "ON," Rail Cooling Switch "OFF"
Cabinet temperature at or above setpoint: CabFM, CLLV, and PH energize. The
2 minute Comp delay timer and 6 hour DT start.
b) Power Switch "ON," Rail Cooling Switch "NORMAL" or "LOW"
Cabinet temperature and rail temperature at or above setpoint: CabFM, CLLV, PH,
RailFM, and RLLV energize. The 2 minute Comp delay timer and 6 hour DT start.
2. Cool Down
a) Power Switch "ON," Rail Cooling Switch "OFF"
CabFM, CLLV, and PH continue. The 2 minute Comp delay timer expires and Comp
and ConFM energize.
b) Power Switch "ON," Rail Cooling Switch "NORMAL" or "LOW"
CabFM, CLLV, PH, RailFM, and RLLV continue. The 2 minute Comp delay timer
expires and Comp and ConFM energize.
3. Cool Down Achieved
To prevent Comp hard starts, CLLV (rail cooling switch "OFF") or RLLV (rail cooling
switch "NORMAL" or "LOW") remains energized when Comp is off.
a) Power Switch "ON," Rail Cooling Switch "OFF"
CTh reaches 3.6°F (2°C) below setpoint. CabFM and PH continue, Comp and ConFM
de-energize. CLLV de-energizes for 2 seconds (CLLV then remains energized during
Comp off time).
b) Power Switch "ON," Rail Cooling Switch "NORMAL" or "LOW"
CTh, RTh, or both have reached 3.6°F (2°C) below setpoint.
(1) Cabinet still cooling, RTh reaches 3.6
°
F (2
°
C) below setpoint
CabFM, Comp, CondFM, CLLV, and PH continue. RailFM continues when rail
cooling switch is in the "NORMAL" position and per F9 setting when in the "LOW"
position. For details, see "II.D.4.a) Switch Settings." RLLV de‑energizes.
(2) CTh reaches 3.6
°
F (2
°
C) below setpoint, rail still cooling
CabFM, Comp, CondFM, PH, RailFM, and RLLV continue. CLLV de-energizes.
Содержание HPR100A
Страница 66: ...66 3 HPR100A D AWAITING DATA...