Hoshizaki F-300BAJ Скачать руководство пользователя страница 50

50

VII. Technical Information

We reserve the right to make changes in specifications and design without prior notice.

A. Specification & Performance Data Sheets

Note: The data in bold should be used for reference.

1. F-300BAJ

Specification Sheet

AC SUPPLY VOLTAGE

115/60/1

AMPERES

7.8 AMPS (AT 104°F / WT 80°F)

MAX. HACR BREAKER SIZE

15 AMPS

ELECTRIC & WATER CONSUMPTION

90/70°F

70/50°F

    ELECTRIC    W  (kWH/100 lbs.)

627(6.14)

586(3.97)

    POTABLE WATER

30(12.0)

42(12.0)

SHAPE OF ICE

Flake

ICE HARDNESS

72% @ (32/21 (90/70), Conductivity 200 µs/cm)

BIN CONTROL SYSTEM

Mechanical Bin Control ( Proximity Sw. )

REFRIGERANT CHARGE

R404A, 0 lb. 9.2 oz.  (260g)

Performance Data Sheet

APPROXIMATE

Ambient

ICE PRODUCTION

Temp. °F (°C)

PER 24 HR.

70 (21)

353 ( 160 )

342 ( 155 )

323 ( 147 )

80 (26)

305 ( 139 )

289 ( 131 )

273 ( 124 )

90 (32)

258 ( 117 )

247 ( 112 )

230 ( 104 )

lbs./day ( kg/day)

100 (38)

217 (

99

)

205 ( 93

)

188 ( 85

)

APPROXIMATE ELECTRIC

70 (21)

586

--

592

--

598

--

CONSUMPTION

80 (26)

604

--

610

--

616

--

90 (32)

621

--

627

--

646

--

watts

100 (38)

665

--

683

--

702

--

APPROXIMATE WATER

70 (21)

42 ( 160 )

41 ( 156 )

39 ( 147 )

CONSUMPTION PER 24 HR.

80 (26)

37 ( 139 )

35 ( 131 )

33 ( 124 )

(TOTAL)

90 (32)

31 ( 117 )

30 ( 112 )

28 ( 104 )

gal. / day (l/day)

100 (38)

26 ( 99

)

25 ( 93

)

23 ( 85

)

EVAPORATOR OUTLET TEMP.

70 (21)

24 ( (-4) )

25 ( (-4) )

25 ( (-4) )

°F (°C)

80 (26)

26 ( (-3) )

26 ( (-3) )

27 ( (-3) )

90 (32)

27 ( (-3) )

28 ( (-2) )

28 ( (-2) )

100 (38)

28 ( (-2) )

28 ( (-2) )

28 ( (-2) )

HEAD PRESSURE

70 (21)

243 ( 17.1 )

253 ( 17.8 )

263 ( 18.5 )

80 (26)

273 ( 19.2 )

283 ( 19.9 )

293 ( 20.6 )

90 (32)

303 ( 21.3 )

313 ( 22.0 )

323 ( 22.7 )

PSIG (kg/cm

2

G)

100 (38)

332 ( 23.3 )

342 ( 24.0 )

351 ( 24.7 )

SUCTION PRESSURE

70 (21)

38 ( 2.6

)

39 ( 2.7

)

40 ( 2.8

)

PSIG (kg/cm

2

G)

80 (26)

40 ( 2.8

)

41 ( 2.9

)

42 ( 3.0

)

90 (32)

43 ( 3.0

)

44 ( 3.1

)

44 ( 3.1

)

100 (38)

45 ( 3.1

)

45 ( 3.1

)

45 ( 3.2

)

BTU/h (AT 90°F / WT 70°F)

BTU/h (AT 90°F / WT 70°F)

HEAT OF REJECTION FROM CONDENSER

2,300

HEAT OF REJECTION FROM COMPRESSOR

700

Water Temp. °F (°C)

50 (10)

70 (21)

90 (32)

ENG F-013.0.1196

Содержание F-300BAJ

Страница 1: ...Models F 300BAJ F 500BAJ Self Contained Flaker Service Manual Number 73214 Issued 1 30 2017 hoshizakiamerica com...

Страница 2: ...rty damage due to improper installation is not covered under warranty Hoshizaki provides this manual primarily to assist qualified service technicians in the service of the appliance Should the reader...

Страница 3: ...4 Continuous Dispensing Timer S1 dip switch 5 6 33 5 Bin Control Selector S1 dip switch 7 34 6 Agitation and Ice Purge Timer S1 dip switch 8 34 7 Mechanical Shutdown Delay S1 dip switch 9 34 8 Factory...

Страница 4: ...anty coverage and may result in costly water damage To reduce the risk of death electric shock serious injury or fire follow basic precautions including the following Only qualified service technician...

Страница 5: ...replace the power cord be sure to connect the power cord s ground wire For Hard Wired Models Electrical connection must be hard wired Before servicing move the power switch to the OFF position Turn of...

Страница 6: ...fully to reduce the risk of costly water damage In areas where water damage is a concern install in a contained area with a floor drain Install the appliance in a location that stays above freezing No...

Страница 7: ...Water Refrigeration Circuit Diagram A Construction 1 F 300BAJ Ice Storage Bin Inlet Water Valve Reservoir Control Box Bin Control The actuator is located in the ice storage bin Spout Evaporator Gear M...

Страница 8: ...8 2 F 500BAJ Ice Storage Bin Inlet Water Valve Reservoir Control Box Bin Control The actuator is located in the ice storage bin Spout Evaporator Gear Motor Compressor Front...

Страница 9: ...BAJ and F 500BAJ Seal Bolt Gear Motor Spline Coupling Housing Lower Bearing O Ring Mechanical Seal Cylinder Auger Extruding Head Upper Bearing Cutter Insulation Socket Head Cap Screw with Split Lock W...

Страница 10: ...igh Pressure Switch Compressor Overflow Hose Reservoir Drain Valve Thermostatic Expansion Valve Spout Water Level Evaporator Float Switch Inlet Water Valve Water Supply Line Gear Motor Drain Pan Evapo...

Страница 11: ...cle starts FT Maximum 90 sec 4 1 in 12 Drain Cycle Although the factory default 1 in 1 drain cycle is recommended a 1 in 12 drain cycle is available For 1 in 12 drain cycle sequence see 3 1 in 12 Hour...

Страница 12: ...oat switch PT purge timer UFS upper float switch WV inlet water valve to 2 Ice Purge Cycle above if UFS closed to 1 Fill Cycle above if UFS open 1 Bin Full GM energized Comp de energized FM de energiz...

Страница 13: ...Make sure that none have fallen into the ice storage bin Make sure all food zones in the icemaker and ice storage bin are clean after service 1 Ice Production Check To check production prepare a buck...

Страница 14: ...hould be taken not to touch live terminals If the icemaker is in alarm see III A 2 LED Lights and Audible Alarm Safeties CB monitors the following switches with 5VDC during the icemaking process Contr...

Страница 15: ...rvoir is empty and LFS and UFS are open 90 sec FT starts WV energizes and fill cycle starts LFS closes Nothing occurs at this time Reservoir continues to fill until UFS closes When UFS closes WV de en...

Страница 16: ...ZT terminates and FT starts FZT 30 Min Freeze Safety Timer FZT starts when UFS closes and terminates when LFS opens If LFS does not open within 30 min of UFS closing CB shuts down the icemaker and sou...

Страница 17: ...t on CB K2 8 O replace CB If 24VAC is present on CB K2 8 O check continuity through WV solenoid If open replace WV If WV is energized and refill exceeds FT with no water in the reservoir check for DV...

Страница 18: ...M de energize and the 5 min ice purge timer begins When the 5 min ice purge timer terminates GM and CCR de energize DV energizes to drain the evaporator and reservoir To avoid the 5 min shutdown delay...

Страница 19: ...from the control transformer and that the fuse is good Check for 24VAC at CB K8 1 W R to CB K8 2 LBU If 24VAC is present and the POWER OK LED is off replace CB 3 5VDC Output Checks CB K9 Connector Co...

Страница 20: ...continuity across the high pressure switch CB K9 3 Y and CB K9 4 Y c Compressor Control Relay CCR CB K9 5 W O and CB K9 6 W O 5VDC is present from CB white K5 connector pin closest to CB red K4 conne...

Страница 21: ...ED is on and GM and CCR are off check for 115VAC from CB K1 2 BK to a neutral W If 115VAC is not present check 115VAC power supply connections from power switch If 115VAC is present check for 115VAC f...

Страница 22: ...5 black 5VDC S1 Dip Switch K8 Connector 24VAC and 5VDC K7 Connector Open K2 Connector 24VAC 5VDC common terminals K3 Connector Open K4 Connector Open K5 Connector Open Inlet Water Valve 8 O 3 2 1 DRA...

Страница 23: ...he ice storage bin door so that you can access the actuator paddle located in the top of the bin See Fig 3 4 With actuator paddle not engaged check for continuity across BC GY wires proximity switch i...

Страница 24: ...should be taken not to touch live terminals COMP LED turns on 9 Press the actuator paddle located in the top of the bin to the right actuator paddle engaged See Fig 4 The 90 sec Comp shutdown timer st...

Страница 25: ...en If open continue to step 5 If closed follow the steps in II E 2 Float Switch Cleaning After cleaning the floats check them again Replace if necessary 5 Reconnect the FS molex plug on the control bo...

Страница 26: ...h a mixture of 1 part Hoshizaki Scale Away and 25 parts warm water 5 While not necessary the floats can be removed from the shaft during cleaning If you remove them note that the blue float is on top...

Страница 27: ...5 Fuse 3A a Blown 6 Bin Control See II D Bin Control Check a Open b Defective 7 Control Switch a In DRAIN position b Defective 8 Compressor Control Relay a Defective 9 Evaporator Heater C model a Defe...

Страница 28: ...l a Defective Refill 1 Float Switch See II E Float Switch Check and Cleaning a Dirty sticking b Defective 2 Inlet Water Valve a Screen or orifice clogged b Defective 3 Water Supply a Water supply off...

Страница 29: ...ntains integrated circuits which are susceptible to failure due to static discharge It is especially important to touch the metal part of the icemaker when handling or replacing the control board Do n...

Страница 30: ...lack 5VDC S1 Dip Switch K8 Connector 24VAC and 5VDC K7 Connector Open K2 Connector 24VAC 5VDC common terminals K3 Connector Open K4 Connector Open K5 Connector Open Inlet Water Valve 8 O 3 2 1 DRAIN J...

Страница 31: ...threshold and the high pressure switch closes 4 High Pressure Switch Third activation in 1 hour Call for service To avoid possible catastrophic failure it is recommended to leave the icemaker off unt...

Страница 32: ...lt Dip Switch Settings The S1 dip switch settings are factory set to the following positions Dip Switch No 1 2 3 4 5 6 7 8 9 10 F 300BAJ F 500BAJ OFF OFF OFF OFF OFF OFF OFF ON OFF OFF infrared sensor...

Страница 33: ...down Delay No 1 No 2 No 3 OFF OFF OFF 0 Seconds ON OFF OFF 100 Seconds 1 6 minutes Factory Default OFF ON OFF 1100 Seconds 18 3 minutes OFF OFF ON 1650 Seconds 27 5 minutes ON ON OFF 2200 Seconds 36 7...

Страница 34: ...6 Agitation and Ice Purge Timer S1 dip switch 8 Not available when S1 dip switch 7 is on Factory set for normal operation No adjustment is required WARNING Do not adjust S1 dip switch 8 out of the fac...

Страница 35: ...trol switch for unit operation 2 Control Switch The control switch has 2 positions ICE and DRAIN When the control switch is in the ICE position open icemaking begins When the control switch is in the...

Страница 36: ...t to the system if using an electronic leak detector and then raise the pressure using nitrogen gas 140 PSIG Do not use R 404A as a mixture with pressurized air for leak testing NOTICE Always recover...

Страница 37: ...g an electronic leak detector and then raise the pressure using nitrogen gas 140 PSIG Do not use R 404A as a mixture with pressurized air for leak testing 3 Evacuation and Recharge R 404A 1 Attach a v...

Страница 38: ...the system to charge with liquid until the proper charge weight is met 8 If necessary add any remaining charge to the system through the low side NOTICE To prevent compressor damage use a throttling v...

Страница 39: ...to the torque value listed below Torque for F 300BAJ and F 500BAJ 11 1 ft lb 15 N m Tighten 2 times Allow at least 5 sec in between each tightening Component Notes Compressor Install a new drier start...

Страница 40: ...r Evaporator Flange Evaporator Assembly Flaker Cutter Flaker Extruding Head Evaporator Socket Head Cap Screw and Split Lock Washer Upper Bearing pressed into extruding head Fig 5 Packing Seal Bolts In...

Страница 41: ...the lower bearing in the housing should be replaced Instructions for removing the extruding head and housing are located later in this procedure Note Replacing the bearing requires a bearing press ada...

Страница 42: ...he DRAIN position c Move the power switch to the ON position and allow the water to drain from the evaporator d Move the power switch to the OFF position then unplug the appliance F 300BAJ or turn off...

Страница 43: ...tions 9 Move the control switch to the ICE position 10 Move the power switch to the ON position 11 Replace the front panel in its correct position then plug the appliance into the electrical outlet F...

Страница 44: ...t a pressure of 3 to 4 PSIG 15 Use an electronic leak detector or soap bubbles to check for leaks Add a trace of refrigerant to the system if using an electronic leak detector and then raise the press...

Страница 45: ...lower housing 8 Remove the O ring and mechanical seal from the housing If only replacing the mechanical seal proceed to step 11 NOTICE To help prevent water leaks be careful not to damage the surfaces...

Страница 46: ...0BAJ 2 Remove the top and side panels 3 Remove the strap connecting the spout to the chute assembly then remove the spout 4 Remove the hex head bolts and washers securing the lower housing to the gear...

Страница 47: ...k do not touch the icemaker power switch or control switch with damp hands Before Servicing Move the icemaker s power switch to the OFF position Turn off the power supply Place the disconnect if appli...

Страница 48: ...pans Repeat with a cup of clean water to rinse Icemaker and Ice Storage Bin Drains Check to make sure they are clear Extruding Head Seal Bolts Inspect for leakage around seal bolts Tighten see torque...

Страница 49: ...osal The appliance contains refrigerant and must be disposed of in accordance with applicable national state and local codes and regulations Refrigerant must be recovered by properly certified service...

Страница 50: ...9 131 273 124 90 32 258 117 247 112 230 104 lbs day kg day 100 38 217 99 205 93 188 85 APPROXIMATE ELECTRIC 70 21 586 592 598 CONSUMPTION 80 26 604 610 616 90 32 621 627 646 watts 100 38 665 683 702 A...

Страница 51: ...191 379 172 lbs day kg day 100 38 361 164 344 156 305 138 APPROXIMATE ELECTRIC 70 21 808 816 823 CONSUMPTION 80 26 831 838 846 90 32 853 861 878 watts 100 38 895 913 930 APPROXIMATE WATER 70 21 64 24...

Страница 52: ...52 B Wiring Diagrams 1 F 300BAJ High Pressure Switch Cut out 426 22 PSIG Cut in 341 22 PSIG 0...

Страница 53: ...53 High Pressure Switch Cut out 426 22 PSIG Cut in 341 22 PSIG 0 2 F 500BAJ...

Отзывы: