9
II. Sequence of Operation and Service Diagnosis
A. Sequence of Operation Flow Chart
Components Ener
giz
ed when the Contr
ol S
witc
h is in the "W
A
SH" P
osition
The "W
A
SH" position on the contr
ol s
witch is used when cleaning and sanitizing the
icemak
er
. W
hen in the "W
A
SH" position,
po
w
er is supplied t
o the pump mot
or and f
an mot
or
. The cleaner and sanitiz
er fl
ow o
ver the e
vapor
at
or plat
e assemb
ly
.
Leg
end:
BC
–bin contr
ol
BCH
–bin contr
ol heat
er
Comp
–compr
essor
DP
–dr
ain pump (optional)
FM
–f
an mot
or
FT
–fr
eez
e timer
FTT
–fr
eez
e t
er
mination timer
HGV
–hot g
as v
al
ve
HT
–har
vest timer
PM
–pump mot
or
WV
–inlet w
at
er v
al
ve
WVT
–inlet w
at
er v
al
ve timer
3-min.
F
T
in contr
ol
AM-50B
AE Ser
ies Sequence Flo
w Char
t
1.
Initial
Har
vest
C
ycl
e
Cy
cle St
eps
2.
Initial F
reez
e Cy
cle
•
WV contin
ues f
or 52 sec.
dur
ing initial fr
eez
e.
• 3-min.
F
T r
esets if t
emper
atur
e r
ises abo
ve
27
°F (-3°C)
dur
ing 3-min.
F
T.
Ther
mist
or
in contr
ol
3.
Nor
mal Har
vest Cy
cle
•
WV time:
1
02 sec.
or the
length of har
vest, whiche
ver
is shor
ter
.
BCH
ener
giz
ed
Comp
ener
giz
ed
HGV
ener
giz
ed
WV
ener
giz
ed
Ther
mist
or dr
ops t
o
27
°F (-3°C)
(6.8 kΩ or mor
e).
3-min.
F
T st
ar
ts
.
BCH
contin
ues
Comp
contin
ues
FM
de-ener
giz
ed
PM
de-ener
giz
ed
HGV
ener
giz
ed
WV
ener
giz
ed
St
ar
tup
Ther
mist
or
in contr
ol
BCH
contin
ues
Comp
contin
ues
FM
ener
giz
ed
PM
ener
giz
ed
HGV
de-ener
giz
ed
50-sec.
HT
Ther
mist
or t
emper
atur
e
reaches 45
°F (7°C)
(4.5 kΩ or less).
50 sec.
HT st
ar
ts
.
50-sec.
HT in
contr
ol
1.
Bin F
ull
W
ithin 1
0 sec.
af
ter ice
cont
acts ther
most
atic
b
ulb
, appliance shuts
do
wn.
Shutdo
wn and R
estar
t
BC Oper
ation
Ice cont
acts
ther
most
atic b
ulb
BC
open
All components
de
-ener
giz
ed e
xcept
BCH
and
DP
2.
Icemak
er Of
f
All
components
de-ener
giz
ed.
3.
Ice Le
vel Lo
w
er
ed
No ice t
ouching
ther
most
atic b
ulb
.
Icemak
er st
ar
ts at
"1
. Initial Har
vest C
ycle
."
To 1 abo
ve
BC
closed
4.
Nor
mal F
reez
e Cy
cle
•
3-min.
F
T
resets
if
temper
atur
e
rises
abo
ve
27
°F (-3°C)
dur
ing 3-min.
F
T.
5-min.
F
TT
in contr
ol
If ther
mist
or st
ay
s
belo
w
27
°F (-3°C),
3-min.
fr
eez
e timer
ter
minat
es and
5-min F
TT st
ar
ts
.
Otherwise
, 3-min.
F
T
rest
ar
ts
.
BCH
contin
ues
Comp
contin
ues
FM
ener
giz
ed
PM
ener
giz
ed
HGV
de-ener
giz
ed
WV
de-ener
giz
ed
WV
de-ener
giz
ed
102-sec.
WVT
52-sec.
3-min.
F
T
in contr
ol
Ther
mist
or
in contr
ol
5-min.
F
TT
in contr
ol
Ther
mist
or dr
ops t
o
27
°F (-3°C)
(6.8 kΩ or mor
e).
3-min.
F
T st
ar
ts
.
If ther
mist
or st
ay
s
belo
w
27
°F (-3°C),
3-min.
fr
eez
e timer
ter
minat
es and
5-min F
TT st
ar
ts
.
Otherwise
, 3-min.
F
T
rest
ar
ts
.
102-sec.
WVT