HORNE T105A Скачать руководство пользователя страница 6

Horne Engineering Ltd 

Issue 7, November 2018 

 

 

 

 

6

 

Allow the shower to run at maximum temperature setting until the water temperature has stabilised.  
Should the temperature rise, or drop, in an uncontrolled fashion, then 
the hot and cold supplies are probably reversed.  Correct this before 
proceeding. 
 
The TSV1-3 is set in the factory to provide a maximum outlet 
temperature of approximately 41°C, but this should be checked on site 
to ensure that the setting has not been altered, and to ensure user 
safety. If necessary, reset the maximum outlet temperature to 41°C.   
 
If the maximum temperature requires adjustment, remove the 
temperature control cap using a small plastic spudger or blade and 
adjust the small slotted screw in the centre of the spindle.  Adjust the 
screw anticlockwise to increase the temperature, clockwise to 
decrease the temperature.  See Fig 8.  
 
 

 

 

 

 

 

 

 

 

 

 

 

 

Fig 8 

 
After setting the maximum temperature, turn the shower on and off a few times and check that the 
maximum setting is correct. Note that the final stabilised Mixed Water Temperature should not exceed 43C 
to comply with DO8.  Record the commissioning information, including equipment used, on the attached 
commissioning sheet to permit the in-service performance of the valve to be assessed at a later date. 
 
Finally, check the thermal shut-off facility of the TSV1-3 by performing a thermal shut off test (often called 
a cold fail test).  With the shower running, close the cold (i.e. right hand) servicing valve. The Servicing 
Valve is closed when the arrows are in the horizontal position, and open when they are in the vertical 
position. See Fig 6.  The flow from the shower head should immediately stop or reduce to a trickle, in 
which case the mixed water temperature rise should be less than 2°C above the set temperature.  In either 
case, there is no scalding risk.  If the temperature rises above this then it is likely that there is 
contamination in the TSV1-3 that is preventing it from shutting off the hot supply.  Restore the supply and 
note the final stabilised temperature, which should not exceed 43°C. 
 
Refer to the maintenance section of this booklet or phone the factory for advice, if necessary. 

 
 

MAINTENANCE 

 
Maintenance of the TSV1-3 shower valve is essential to ensure the product continues to perform to 
specification after installation, and continues to afford scald protection.  Record all maintenance carried out 
on the attached commissioning and maintenance record. 
 
When cleaning the external faceplates and knobs, never use cleaners containing abrasives or solvents as 
they may damage the chrome plating.  Use only a soft cloth and soap. 
 
The frequency of routine maintenance of the TSV1-3 internals (i.e. cleaning, descaling etc) depends 
largely on the condition of the water supplies, and local knowledge will dictate suitable intervals.  In 
addition to this the following precautions should be observed. 
 
Initially check the strainer baskets for debris every three months and clean if required.  This period can be 
increased if appropriate once the general condition and cleanliness of the water is established. 
 
Perform a thermal shut-off test every three months, and check the maximum temperature setting.  See the 
last paragraph in the Commissioning Instructions for details of the thermal shut-off test and re-adjustment 
of the maximum temperature setting, if required. 
 
If the maximum water temperature rises by more than 2K (2°C) from the commissioned setting then 
ensure that the strainers are clean and that the isolating valves are fully open.  Test the Check Valves as 
described below.  If these tests do not highlight the reason for the temperature rise then follow the 
procedure below for investigating failure of the thermal shut-off test. 

Содержание T105A

Страница 1: ...fed by supplies with differing pressures use the following to determine whether a pressure reducing valve PRV is required on the side with the higher pressure Note that output flow rate is always det...

Страница 2: ...head shown p13 Bottom of panel should be 1 1 metres from finished floor level 1 Position the Pre Plumbed Enclosure Identify a suitable position for the Enclosure and mark a line on the wall level wit...

Страница 3: ...screw and being careful not to scratch the enclosure or its covers lay it down where it will not be damaged Drill the 4 holes and install the wall plugs 6 Attach the Pre Plumbed Enclosure to the Wall...

Страница 4: ...rk in accordance with Water Bylaws 2000 Scotland and BS 6700 1997 England Wales The use of a Horne flushing kit is strongly recommended because this connects directly to the water inlets to the mixing...

Страница 5: ...before the pre plumbed enclosure is attached to the wall Accordingly point 7 on the attached installation instructions Connect the Supply Pipes should be performed before point 6 Attach the Pre Plumbe...

Страница 6: ...ve the set temperature In either case there is no scalding risk If the temperature rises above this then it is likely that there is contamination in the TSV1 3 that is preventing it from shutting off...

Страница 7: ...2 5 Nm Ensure the on off assembly is torqued down to 25 Nm 34 lbft to prevent the user from inadvertently unscrewing the assembly during flow control Do not over tighten the assembly The Check Valves...

Страница 8: ...efore performing this test If mixed water continues to flow and is coming from the showerhead at a temperature of more than 2 C above the maximum mixed water temperature setting then the TSV1 3 is due...

Страница 9: ...fter commissioning If small adjustments 1 to 2 K are required then check the strainers for cleanliness make sure the isolating valves are fully open and verify the check valves are operating correctly...

Страница 10: ...Horne Engineering Ltd Issue 7 November 2018 10...

Страница 11: ...Horne Engineering Ltd Issue 7 November 2018 11...

Страница 12: ...Horne Engineering Ltd Issue 7 November 2018 12...

Страница 13: ...Horne Engineering Ltd Issue 7 November 2018 13...

Страница 14: ...Max Mixed Water Temp during CW Isolation test C Mixed Water Temp on restoration of CW Supply C Note MWT should return within 2 degrees of set temp and be no greater than 43C after this test Comments...

Страница 15: ...y C Note MWT should return within 2 degrees of set temp and be no greater than 43C after this test Comments Recommended Date of Next In Service Test In Service Testing Record Establishment Location of...

Страница 16: ...ng Ltd Issue 7 November 2018 16 Brochure Ref L 189 T10XA Horne Engineering Ltd PO Box 7 Rankine Street Johnstone SCOTLAND PA5 8BD Tel 44 0 1505 321455 Fax 44 0 1505 336287 Email Technical horne co uk...

Отзывы: