
Horne Engineering Ltd
Issue 7, November 2018
4
Fig 4. NB It is important to use the supplied screw bushes.
Fig 5.
7) Connect the Supply Pipes
N.B. Ensure that the top cover of the pre-plumbed enclosure is replaced prior to connecting up the
supply pipes. The fitting of isolation valves is required as close as practicable to the water supplies
inlets of the shower panel.
Connect the hot water supply to the left hand inlet, and cold water to the right-hand inlet (See Fig 5).
DO NOT OPEN THE WATER SUPPLIES AT THIS STAGE AS THEY HAVE NOT BEEN FLUSHED
OUT TO REMOVE THE DEBRIS IN THE PIPEWORK. SUCH DEBRIS CAN DAMAGE THE
THERMOSTATIC VALVE.
8) Flush the Pipework
Flush out the pipework in accordance with Water Bylaws 2000 (Scotland) and BS 6700: 1997
(England & Wales). The use of a Horne flushing kit is strongly recommended, because this
connects directly to the water inlets to the mixing valve. Access to the flushing points is gained
from underneath the casing through the lower end cap. Isolate the water supplies and also the
low level servicing valves located on the side of the panel (see Fig 6) using the supplied 4mm hex
key. Remove the strainer cap with the strainer basket and screw in the flushing adapter. Place
the end of the flushing hose in an appropriate drain or container and turn on the supply to flush as
required. After flushing, remove the flushing adapter and replace the strainer cap. Repeat for
both hot and cold supplies. See Figs 6 and 7.
NOTE THAT IF THERE IS ANY DANGER OF FREEZING THEN THE PIPES AND TSV1-3 MUST
BE DRAINED TO AVOID DAMAGE.
Содержание T105A
Страница 10: ...Horne Engineering Ltd Issue 7 November 2018 10...
Страница 11: ...Horne Engineering Ltd Issue 7 November 2018 11...
Страница 12: ...Horne Engineering Ltd Issue 7 November 2018 12...
Страница 13: ...Horne Engineering Ltd Issue 7 November 2018 13...