
51
Basic Setup
Setting the Perforation Blades
- If the perforation blades are not installed, install
them in the blade holder. See section 7-7.
Use the functions shown to the right to move the
upper blade over the lower blade.
Fit the tip of the upper blade against
the top of the lower blade, and then
tighten the assembly.
3-7
Setting the Perforation Blades
23051
30701A1
Moving the upper
blade over the
lower blade
Upper
Perforation
Blade
Lower
Perforation
Blade
-Press the Emergency Stop button before starting
this operation.Otherwise, the machine may start
suddenly and cause severe personal injury.
-Wear cutting proof gloves during this operation.
Otherwise, a sharp blade can cause severe
personal injury.
-Do not touch the blades.
WARNING
Setup - Roller Gap Screen
23051
30701B1
When you press this button, this button
turns orange. The upper perforation shaft
is lifted, and the upper blade is separated
from the lower blade.
The upper perforation shaft returns to the
original height. Return the perforation shaft
after moving the upper blade sideways and
away from the lower blade. Otherwise, the
blades can hit each other and be damaged.
If you are doing perforating:
The perforation mechanism is aligned with the
fold knife.
13071
30701D1
The position of the perforation line can be
adjusted by changing the sheet position, as
described in page 59 .
13071
30701C1
Upper Blade
Lower Blade
This line is aligned with the fold knife. Align
the upper blade with this line.
Содержание AFC-566F
Страница 10: ...This page is intentionally left blank ...
Страница 42: ...This page is intentionally left blank ...
Страница 66: ...This page is intentionally left blank ...
Страница 166: ...Phone 81 75 934 6700 Fax 81 75 934 6708 www horizon co jp Manufacturer ...