Hoover Nextra Скачать руководство пользователя страница 1

           

 

 

 

2004

 

1           3 

Picture 2 

 

HOOVER "NEXTRA" FRONT LOADING WASHING MACHINES:  

 
A) 

Starting the Auto -test Sequence: 

 

 

Push and hold the 1

st

 Option's Button 

from left (Ref. 1 in Picture 1). 

 

  Turn the Knob of the  

Program's Selector 2 steps in clockwise sense.

 

 

  As soon as the LED of the 1

st

 Option's Button comes up lighted,

 release the button.

 

 

  All 

LEDs of Control Panel 

 are 

lighted together (see Picture 2): 

 

  After 3 seconds and within 5 

seconds, 

push again the Option's 

Button n. 1 

(see Picture 2). 

 

 

Once the Auto -test is correctly 
initialized, the two rows of the 
LEDs of Residual Time and of the Option's Buttons start flashing alternatively. 

Fro this 

moment onward, the Auto-test Checking Routine sequence is carried out automatically, 
as it's next described:  

 

 

B) 

Description of the Sequence of Auto -test: 

 

B1) 

Water load to the basic level (through detergent compartment n. 1 (Pre-wash), 

carried out 

through the Cold Water Solenoid Valve (and Hot Water Valve too, when present. 

If 

present, it's fed the Recycle Pump.

 

 

B2)  1 second 

pause

 

B3)  It's fed for 

16 seconds the Water Heating Element 

(9.10 A on digital ammeter); the water 

distribution cam moves the 

Water Spray Nozzle over the detergent compartment n. 2 

(Wash).

 

 

B4)  Are simultaneously fed the 

Solenoid Valve for Cold Water 

(and for Hot Water, when 

present), 

the Recycle Pump 

(when present) 

and the main Motor, to tumble the Drum at 

55 rpm in counterclockwise sense, 

for 13 seconds. 

 

B5) 

Motor is paused 

for 15 seconds. Water load continues, as above described. 

 

B6)  Are simultaneously fed the 

Solenoid Valve for Cold Water 

(and for Hot Water, when 

present), 

the Recycle Pump 

(when present) 

and the main Motor, to tumble the Drum at 

55 rpm in clockwise sense

, for 13 seconds. In this phase, if the Option's Button n. 3 is 

pushed (see Picture 2), the Drum's speed of revolution can be reduced from 55 to 35 
rpm. 

 

B7)  It's fed the 

Drain Pump

, until the Pressure Switch is tripped to the "Empty Tank" 

condition. 

 

B8)  It's carried out a short 

Spin Sequence, lasting 27 seconds, 

at the half of the maximum 

speed available. End of the Auto-test routine. 

Отзывы: