When hanging the KAP from the ceiling/roof structure above, make sure it is mount
-
ed with structural steel or uni-strut supports from underneath the unit. Verify the
size and number of supports required as well as ceiling integrity with your building’s
structural engineer. Make sure that the supports do not interfere with the service ac-
cess doors or with filter removal by providing proper clearance (see page 4). Make
sure the unit has 18” clearance from combustibles as per NFPA 96 and federal,
state and local codes.
INDOOR/CEILING MOUNTED INSTALLATIONS
INSTALLATION (Cont’d.)
Pg. 7
710 S. Powerline Road, Deerfield Beach, FL 33442 • 954 570-4083 • 800 322-8730 • www.hooddepot.net