Honeywell VE4000 Series Скачать руководство пользователя страница 5

 

Honeywell 

ISTR0018  1602RA-NE 

INSTALLATION 

 WARNING 

 

Take care that installer is a trained experienced 
service man. 

 

Turn off gas supply before starting installation. 

 

Disconnect power supply to prevent electrical shock 
and/or equipment damage. 

 

Mounting position 

The gas valve can be mounted plus or minus 90 degrees from 
the vertical. 
 

Mounting location 

The distance between the gas valve and the wall/ground, must 
be at least 30 cm. 

 

 WARNING 

 

The outlet of a pressure relief valve (VE4000S series) 
must always be connected to open atmosphere. 

 

Main gas connection threaded valves 

 

Take care that dirt cannot enter the gas valve during 
handling.  

 

Ensure the gas flows in the same direction as the arrow 
on the housing of the gas valve. 

 

Use a sound taper fitting with thread according to ISO 7-1 
(BS 21, DIN2999) or a piece of new, properly reamed 
pipe, free from swarf 

 

Do not thread or tighten the pipe or pipe fitting too far. 
Otherwise valve distortion and malfunction could result. 

 

Apply a moderate amount of good quality thread 
compound to the pipe or fitting only, leaving the two end 
threads bare. PTFE tape may be used as an alternative. 

 

In order to tighten the pipe in the valve, do not use the 
actuator as a lever but use a suitable wrench operating on 
the wrench bosses. 

    
 
 

 

Main gas connection flanged valves 

 

Take care that dirt cannot enter the gas valve during 
handling. 

 

Ensure the gas flows in the same direction as the arrow 
on the housing of the gas valve. 

 

Ensure that inlet and outlet flanges are in line and 
separated from each other enough to allow the valve to be 
mounted between them without damaging the gasket. 

 

Place gasket. If necessary grease it slightly to keep it in 
place. 

 

Mount gas valve between flanges using the bolts for each 
flange.

 

 

 WARNING 

Tightness test after installation 

 

Paint all pipe connections and gaskets with a strong 
soap and water solution.. 

 

Start the appliance and check for bubbles. If a leak is 
found in a pipe connection, remake the joint. A gasket 
leak can usually be stopped by tightening the 
mounting screws. Otherwise, replace the gas valve. 

 

Electrical connection 

 CAUTION 

 

Switch off power supply before making electrical 
connections. 

 

Take care that wiring is in accordance with local 
regulations. 

 
Use lead wire which can withstand 105 °C ambient. 
The electric on/off operator is provided with a terminal block 
for electrical connections. 
 

Wiring 

Follow the instructions supplied by the appliance 
manufacturer. 

 

 

Содержание VE4000 Series

Страница 1: ...e housing The VExxxxX3xxx and VE5xxxX3xxx series gas valves are equipped at both sides with mounting holes to adapt a pilot solenoid valve combination to allow either internal or external pilot gas Furthermore these valves are equipped with two M6 mounting holes to adapt an A4020A electronic leak test The VExxxxB series gas valves have an adjustable flow rate regulator on top of the coil For the V...

Страница 2: ...egulated ON OFF VExxxxAxxxx Standard Standard Flow regulator VExxxxBxxxx Optional Optional 2 Adjustable opening and flow regulator VExxxxCxxxx Optional 1 Not available Motorized opening ON OFF VE5xxxAxxxx Not available VE5065A3xxx VE5085A3xxx Motorized opening characterized VE5xxxCxxxx Not available VE5065C3xxx VE5085C3xxx Safety relief valve ON OFF Normally Open with or without position indicatio...

Страница 3: ...alve will function between 85 and 110 of the rated voltage Electrical connection VE4xxx VE6xxx VE8xxx Option 1 Wiring on terminal block on circuit cables entering box via PG Cable Gland Option 2 Connection by means of DIN plug on DIN faced connection located on front cover according to ISO4400 DIN EN 175301 803 Electrical connection VE5xxx series See product literature fluid power actuators Enclos...

Страница 4: ...2 723 125 180 POWER CONSUMPTION Version S 200 mbar Model number 12 Volt 50 60Hz nominal 12 Volt 50 60Hz 110 of nominal 24Volt 50 60Hz nominal 24 Volt 50 60Hz 110 of nominal 24 Volt dc nominala b 24 Volt dc 110 of nominal 110 Volt 50 60Hz nominal 110 Volt 50 60Hz 110 of nominal 220 Volt 50 60Hz nominal 220 Volt 50 60Hz 110 of nominal VExx20S 16 19 17 21 14 17 16 19 POWER CONSUMPTION Version S 360 m...

Страница 5: ...n alternative In order to tighten the pipe in the valve do not use the actuator as a lever but use a suitable wrench operating on the wrench bosses Main gas connection flanged valves Take care that dirt cannot enter the gas valve during handling Ensure the gas flows in the same direction as the arrow on the housing of the gas valve Ensure that inlet and outlet flanges are in line and separated fro...

Страница 6: ...the box and tightened as shown in Fig 2 Specified torque for the nut 4 Nm Mounted PG gland shown in Fig 3 Specified torque PG gland 3 Nm Fig 2 Fig 3 After connecting wires L N PE to dedicated connectors on connector block the connection needs to closed by mounting the front cover Before placing the cover please check the correct position of seal as shown in Fig 4 The cover can only be mounted in o...

Страница 7: ... in the slot of adjustment screw which is situated in center of the valve Turn screw driver counter clockwise to increase or clockwise to decrease step pressure Replace cap on top of the coil Step pressure adjustment Fig 8 Opening speed adjustment Remove the cap from top of the coil by loosening both screws Place screw driver in the slot of adjustment screw which is of center line Turn screw drive...

Страница 8: ... 200 240 DIN BB0xxxxx VExx20 VExx25 24 PG BB0xxxxx 100 120 PG BB0xxxxx 200 240 PG BB0xxxxx VExx20 VExx25 24 DIN BB0xxxxx 100 120 DIN BB0xxxxx 200 240 DIN BB0xxxxx VExx32 VExx40 24 PG BB0xxxxx 100 120 PG BB0xxxxx 200 240 PG BB0xxxxx VExx32 VExx40 24 DIN BB0xxxxx 100 120 DIN BB0xxxxx 200 240 DIN BB0xxxxx Valve type Voltage Connection Ordering number VExx50 24 PG BB0xxxxx 100 120 PG BB0xxxxx 200 240 ...

Отзывы: