
Honeywell
24
730xxxxxe © Elster GmbH | All rights reserved. Subject to modification
The oil quantity is correct when the oil is visible in the threads of the oil-
level inspection borehole (Fig. 11 | No. 2) or in the centre of the inspection
window.
After filling, the plugs must be inserted again together with the O-ring and
tightened with a torque of 9 Nm.
Commissioning:
Slowly fill the system until the operating pressure is reached.
The pressure rise must not exceed 350 mbar/s.
A bypass line should be used for filling (recommendation:
12
mm pipe diameter).
Do not exceed the measuring range of the gas meter even briefly.
A tightness test must then be carried out.
Содержание RABO G100
Страница 2: ...Honeywell 2 730xxxxxx Elster GmbH All rights reserved Subject to modification ...
Страница 4: ...Honeywell 4 730xxxxxx Elster GmbH All rights reserved Subject to modification ...
Страница 6: ......
Страница 32: ...Honeywell 32 730xxxxxe Elster GmbH All rights reserved Subject to modification ...
Страница 34: ...Honeywell 34 730xxxxxd Elster GmbH Alle Rechte und Änderungen vorbehalten ...
Страница 60: ...Honeywell 60 730xxxxxd Elster GmbH Alle Rechte und Änderungen vorbehalten ...
Страница 62: ...Honeywell 62 730xxxxxd Elster GmbH Tous droits et modifications réservés ...
Страница 64: ...Honeywell 64 730xxxxxd Elster GmbH Tous droits et modifications réservés ...
Страница 90: ......
Страница 117: ...Honeywell 730xxxxxd Elster GmbH Reservados todos los derechos y el derecho a realizar modificaciones 117 Español ...
Страница 118: ......
Страница 120: ......
Страница 146: ...Honeywell 146 730xxxxxd Elster GmbH Tutti i diritti riservati e salvo modifiche tecniche ...
Страница 148: ......
Страница 174: ...Honeywell 174 730xxxxxd Elster GmbH Alle rechten en wijzigingen voorbehouden ...
Страница 175: ......