R7120D BURNER CONTROL MODULES

66-1196EF—01

14

i.

If the pilot does not ignite and if the ignition spark is 

still continuous, adjust the pressure regulator until a 

pilot is established.

j.

When the pilot ignites properly and stays ignited, 

open the master switch and remove the jumper(s) 

from the terminals of the subbase.

k. Check for adequate bleeding of the fuel line.

l.

Reinstall the Relay Module on the subbase, close the 

master switch and then return to step 4.

7.

When pilot ignites, measure the flame signal. If the pilot 

flame signal is unsteady or approaching the 1.25 Vdc 

minimum value, adjust the pilot flame size or detector 

sighting to provide a maximum and steady flame signal.

8.

Recycle the system to recheck lightoff and pilot flame signal.

9.

When the MAIN LED turns on, make sure the automatic 

main fuel valve is open; then smoothly open the manual 

main fuel shutoff valve(s) and watch for main burner 

flame ignition. When the main burner flame is estab-

lished, go to step 16.

10.

If the main burner flame is not established within five 

seconds or the normal lightoff time as specified by the 

equipment manufacturer, close the manual main fuel 

shutoff valve(s).

11.

Recycle the system to recheck the lightoff and pilot 

flame signal.

12.

Smoothly open the manual fuel shutoff valve(s) and try 

lightoff again. (The first re-attempt may have been required 

to purge the lines and bring sufficient fuel to the burner.)

13.

If the main burner flame is not established within five 

seconds or the normal lightoff time specified by the 

equipment manufacturer, close the manual main fuel 

shutoff valve(s). Check all burner adjustments.

14.

If the main burner flame is not established after two attempts:

a. Check for improper pilot size.

b. Check for excess combustion air at low fire.

c. Check for adequate low fire fuel flow.

d. Check for proper gas supply pressure.

e. Check for proper valve operation.

f. Check for proper pilot flame positioning.

15.

Repeat steps 8 and 9 to establish the main burner 

flame; then go to step 16.

16.

With the sequence in RUN, make burner adjustments 

for flame stability and Btu input rating.

17.

Shut down the system by opening the burner switch or 

by lowering the setpoint of the operating controller. 

Make sure the main flame goes out. There may be a 

delay due to gas trapped between the valve(s) and 

burner. Make sure all automatic fuel valve(s) close.

18.

Restart the system by closing the burner switch and/or 

raising the setpoint of the operating controller. Observe 

that the pilot is established during PILOT IGN and the 

main burner flame is established during MAIN IGN 

within the normal lightoff time.

19.

Measure the flame signal. Continue to check for the 

proper signal through the RUN period. Check the signal 

at both High and Low Firing Rate positions and while 

modulating, if applicable.

20.

Run the burner through another sequence, observing 

the flame signal for:

a. Pilot flame alone.

b. Pilot and main flame together.

c. Main flame alone (unless monitoring an intermittent 

pilot). Also observe the time it takes to light the main 

flame. Ignition of main flame should be smooth.

21.

Make sure all readings are in the required ranges

before proceeding.

22.

Return the system to normal operation.

NOTE: After completing these tests, open the master switch 

and remove all test jumpers from the subbase termi-

nals, limits/controls or switches.

Direct Spark Ignition Systems

This check applies to gas and oil burners not using a pilot. It 

should immediately follow the preliminary inspection. Refer to 

the appropriate sample block diagram of field wiring for the 

ignition transformer and fuel valve(s) hookup.

NOTE: Low fuel pressure limits, if used, could be open. If so, 

bypass them with jumpers during this check.

1.

Open the master switch.

2.

Complete the normal ready-to-fire checkout of the fuel 

supply and equipment as recommended by the equip-

ment manufacturer.

3.

Close all manual main fuel shutoff valve(s). Check that 

the automatic fuel valve(s) is closed. Make sure fuel is 

not entering the combustion chamber.

4.

Close the master switch and start the system with a call 

for heat by raising the setpoint of the operating control-

ler; see the relay module sequencing. The program 

sequence should start the INITIATE sequence.

5.

Let the sequence advance through PREPURGE (if applica-

ble). Ignition spark should occur when the PILOT LED turns 

on. Listen for the click of the first stage fuel solenoid valve(s). 

The Relay Module locks out and the ALARM LED turns on.

6.

Let the Relay Module complete its cycle.

7.

Open the manual fuel shutoff valve(s).

8.

Push the reset button and the relay module recycles the 

program sequence through PREPURGE (if applicable).

9.

When the PILOT LED turns on, make sure that the first 

stage burner flame is established. If it is, go to step 15.

10.

If the first stage burner flame is not established within 

four seconds, or within the normal lightoff time specified 

by the equipment manufacturer, close the manual fuel 

shutoff valve(s), and open the master switch.

11.

Check all burner adjustments.

12.

Wait about three minutes. Close the master switch, 

open the manual fuel shutoff valve(s), and try to light off 

the burner again. The first attempt may be required to 

purge the lines and bring sufficient fuel to the burner.

13.

If the first stage burner flame is not established within 

four seconds, or within the normal lightoff time specified 

by the equipment manufacturer, close the manual fuel 

shutoff valve(s), and open the master switch.

14.

If necessary, repeat steps 11 through 13 to establish

the first stage burner flame. Then go to step 15.

15.

When the first stage burner flame is established, the 

sequence advances to RUN. Make burner adjustments 

for flame stability and input rating. If a second stage is 

used, go to step 18.

16.

Shut down the system by opening the burner switch or 

by lowering the setpoint of the operating controller. 

Make sure the burner flame goes out and all automatic 

fuel valves close.

17.

If used, remove the bypass jumpers from the low fuel

pressure limit and subbase.

18.

If a second stage is used, make sure the automatic sec-

ond stage fuel valve(s) opened. Check the lightoff as 

follows (or go to step 19):

a. Open the manual second stage fuel valve(s).

b. Restart the system by raising the setpoint of the 

operating controller.

Содержание R7120D

Страница 1: ...eye D30 or E3XX SPECIFICATIONS Electrical Ratings See Table 2 Voltage and Frequency 120 Vac 10 15 50 60 Hz 10 Power Dissipation 10W maximum Maximum Total Connected Load 2000 VA Fusing Total Connected Load 15A Fast Blow type SC or equivalent Environmental Ratings Ambient Temperature Operating 40 F to 140 F 40 C to 60 C Storage 40 F to 150 F 40 C to 66 C Humidity 85 relative humidity continuous nonc...

Страница 2: ...ge or failure Do not perform a dielectric test with the relay module installed Internal surge protectors can break down allowing relay module to fail the dielectric test and destroy the internal lightning and high current protection WARNING Electrical Shock Hazard Can cause serious injury death or equipment damage Disconnect power supply before beginning installation More than one disconnect may b...

Страница 3: ... an electrical panel be sure there is ade quate clearance behind the closed door of the panel so there is no interference with the R7120 Mounting Other System Components Refer to Fig 9 for exploded view of installation or the applicable specification sheet for mounting other system components WARNING Fire or Explosion Hazard Can cause severe injury death or property damage Follow applicable safety...

Страница 4: ...T JACK REMOTE RESET DDL DDL COMMUNICATIONS INDICATES FEEDBACK SENSING OF RELAY CONTACT STATUS AND LINE VOLT INPUTS FIELD WIRING INTERNAL WIRING PILOT PILOT V2 MAIN VALVE 1K 9K RELAY STATUS FEEDBACK AND LINE VOLTAGE INPUTS 1K1 8K1 8K2 9K1 9K2 120 Vac 50 60 Hz FLAME SIGNAL TEST LOW FIRE SWITCH PROVIDE DISCONNECT MEANS AND OVERLOAD PROTECTION AS REQUIRED R7120D2000 DOES NOT HAVE A PURGE INTERLOCK RS4...

Страница 5: ...0 25 00 15 20 SWITCHING MOTOR ACTION BURNER BLOWER MOTOR LIMITS AND BURNER CONTROLLER CLOSED LOCKOUT INTERLOCKS CLOSED PII CLOSED LOW FIRE SW SAFE START CHECK FLAME PROVING 10 SEC IGN PILOT 5 M 13 TO 3 TO 3 TO M D TO 10 11 TO 10 X TO M32637 HIGH FIRE SW 8 TO 10 12 TO 10 12 TO M 13 P L1 MAIN VALVE 7 TIMED PREPURGE POWER FLAME MAIN PILOT ALARM POWER FLAME MAIN PILOT ALARM ALARM ALARM ALARM 00 SSC LE...

Страница 6: ...ATE MOTOR 4 20mA CONTROLLER 135 OHM CONTROLLER AUTO LO COM HI AUTO LO COM HI LIMIT OPERATING SWITCHES BURNER SWITCH RUNNING INTERLOCK D10 EP100 OR D20 EP200 TYPICAL WIRING LOW FIRE START INTERLOCK PURGE INTERLOCK MASTER SWITCH LOCKOUT ALARM MAIN FUEL VALVE S PILOT VALVE S IGNITION TRANSFORMER 1 1 1 1 1 1 1 2 3 3 2 2 USED ONLY ON D10 OR EP100 SERIES PROGRAMMERS LOCATE THE PURGE INTERLOCK WIRE CONNE...

Страница 7: ...PER MOTOR INITIATE INITIAL POWERUP ONLY POWER STANDBY PREPURGE HOLD DRIVE TO LOW FIRE POWER PILOT FLAME MAIN POWER PFEP 10 SEC 4 SEC IF JR1 CLIPPED PILOT FLAME MAIN POWER MFEP PILOT FLAME MAIN RUN POWER POSTPURGE POWER STANDBY 00 00 10 25 00 15 20 MOTOR ACTION BURNER BLOWER MOTOR INTERMITTENT PILOT VALVE LIMITS AND BURNER CONTROLLER CLOSED RUNNING INTERLOCKS CLOSED PII CLOSED LOW FIRE SW SAFE STAR...

Страница 8: ...equired 250 VA pilot duty or 65 VA pilot duty in parallel with motorized valve s using a total of 1150 VA locked rotor inrush 460 VA to open and 250 VA to hold or motorized valve s using a total of 1500 VA locked rotor inrush 600 VA to open and 250 VA to hold L1 L2 S2 S1 A 8 7 6 5 13 12 X P D M 3 L2 N L1 L 11 10 FLAME DETECTOR UV BURNER BLOWER MOTOR VALVE PROOF OF CLOSURE LIMIT OPERATING SWITCHES ...

Страница 9: ...iming Interlock Circuits Firing Rate Circuit Energy Saving Pre Purge Approval Code Bodies Pilot Main R7120D 2000 10 sec 4 or 10 sec 10 15 sec a or intermittent 15 sec Pre Ignition Running Low Fire 4 wire modulating No UL CSA Modulating R7120D 1002 10 or 15 sec Pre Ignition Lockout High and Low Fire FM IRI Modulating R7120D 3007 10 sec or intermittent Pre Ignition Running isolated Low Fire 2 wire i...

Страница 10: ...LAME ESTABLISHING Period MFEP a Low Fire Switch Opens b Lockout Interlock opens R7120D1002 c Ignition pilot valve intermittent pilot valve terminal is not energized d Main valve terminal is not energized e No flame is present at the end of MFEP f Internal system fault occurs g Purge card is removed h Purge card is bad 6 RUN Period a No flame is present b Lockout Interlock opens R7120D1002 c Interr...

Страница 11: ...ty shutdown occurs 3 The Pre Ignition Interlock input is ignored throughout the Ignition Trial state b Flame must be proven by the end of the 10 second PFEP four if JR1 is clipped to allow the sequence to continue If flame is not proven by the end of PFEP a safety shutdown occurs 2 Main Flame Establishing Period MFEP a Terminal 7 is energized when the presence of flame is verified at the end of th...

Страница 12: ...osition drives the firing rate motor to the Low Fire position NOTE When R7120 is switched to the Test mode it stops and holds at the next Run Test Switch point in the operating sequence Make sure that the Run Test Switch is in the RUN position before leaving the installation SETTINGS AND ADJUSTMENTS Selectable Site Configurable Jumpers The R7120 has site configurable jumper options see Fig 10 and ...

Страница 13: ...esent is in RUN position 10 System is in STANDBY condition STANDBY message is displayed in the S7800 Keyboard Display Module 11 All limits and interlocks are reset Flame Signal Measurement See instructions provided with the amplifier Initial Lightoff Checks Proved Pilot Systems Perform this check on all installations that use a pilot It should immediately follow the preliminary inspection NOTE Low...

Страница 14: ...light the main flame Ignition of main flame should be smooth 21 Make sure all readings are in the required ranges before proceeding 22 Return the system to normal operation NOTE After completing these tests open the master switch and remove all test jumpers from the subbase termi nals limits controls or switches Direct Spark Ignition Systems This check applies to gas and oil burners not using a pi...

Страница 15: ... the sequence after the start of the PILOT IGN period 7 Turn down the pilot pressure very slowly reading the manometer or pressure gauge as it drops Stop instantly when the FLAME LED goes out Note the pres sure The pilot is at the minimum turndown position Immediately turn up the pilot pressure until the FLAME LED comes on again or the flame signal increases to 1 25 Vdc NOTE If there is no flame f...

Страница 16: ...ot open the master switch NOTE Some burners continue to purge oil lines between the valves and nozzles even though the fuel valves are closed Terminating the firing cycle instead of opening the master switch allows purging the com bustion chamber This reduces a buildup of fuel vapors in the combustion chamber caused by oil line purging 5 If the detector is sensing hot refractory correct the con di...

Страница 17: ...nds depending on the jumper configuration selection for Pilot Flame Establishing Period PFEP after the pilot valve s is energized to denote the fault e Safety shutdown occurs 3 Failure to ignite main only interrupted pilot application a Open the manual pilot valve s leave the main fuel manual shutoff valve s closed b Depress the RESET button c Start the system d The pilot should ignite and the fla...

Страница 18: ...R7120D BURNER CONTROL MODULES 66 1196EF 01 18 ...

Страница 19: ...R7120D BURNER CONTROL MODULES 19 66 1196EF 01 ...

Страница 20: ... Automation and Control Solutions Honeywell International Inc 1985 Douglas Drive North Golden Valley MN 55422 customer honeywell com U S Registered Trademark 2011 Honeywell International Inc 66 1196EF 01 M S 07 11 Printed in U S A ...

Страница 21: ...nnage Modèles R7120D disponibles R7120D1002 pour Fireye D10 ou E1XX R7120D2000 pour Fireye D20 ou E2XX R7120D3007 pour Fireye D30 ou E3XX CARACTÉRISTIQUES TECHNIQUES Caractéristiques électriques voir tableau 2 Tension et fréquence 120 V c a 10 15 50 60 Hz 10 Dissipation d énergie 10 W maximum Charge connectée totale maximum 2000 VA Fusible pour charge connectée totale 15 A à fusion rapide type SC ...

Страница 22: ...ûleur MISE EN GARDE Risque de choc électrique Peut endommager ou causer une défaillance de l équipement Ne pas effectuer de test diélectrique lorsque le module de relais est installé Le suppresseur de surtension interne peut tomber en panne causant l échec du test diélectrique par le module du relais et la destruction de la protection contre la foudre et les hautes intensités AVERTISSEMENT Risque ...

Страница 23: ...uffisant derrière la porte fermée du tableau pour qu il n y ait pas d interférence avec le R7120 Montage des autres composants du système Consulter la Fig 9 pour la vue éclatée de l installation ou la notice technique applicable pour le montage des autres composants du système AVERTISSEMENT Risque d incendie ou d explosion Peut causer des dégâts et des blessures graves voire mortelles Respecter to...

Страница 24: ...PRISE DE TEST RÉARMEMENT À DISTANCE DDL COMMUNICATIONS DDL INDIQUE UNE DÉTECTION DE SIGNAL DE RETOUR DU STATUT DES CONTACTS DU RELAIS ET DES ENTRÉES DE TENSION SECTEUR CÂBLAGE SUR SITE CÂBLAGE INTERNE VEILLEUSE VEILLEUSE V2 VANNE PRINCIPALE 1K 9K RETOUR ÉTAT RELAIS ET ENTRÉES SECTEUR 1K1 8K1 8K2 9K1 9K2 120 V c a 50 60 Hz SIGNAL DE FLAMME TEST INTERRUPTEUR COMBUSTION BASSE PLACER SI NÉCESSAIRE UN ...

Страница 25: ...TION VÉRIFICATION DE DÉMARRAGE DE SÉCURITÉ VÉRIFICATION DE FLAMME ALL VEILLEUSE 10 s5 M 13 À 3 À 3 À M D À 10 11 À 10 X À MF32637 INTERRUPTEUR HAUTE COMBUSTION 8 À 10 12 À 10 12 À M 13 P L1 VANNE PRINCIPALE 7 PRÉBALAYAGE TEMPORISÉ ALIMEN TATION FLAMME PRINCIPAL VEILLEUSE ALARME ALIMEN TATION FLAMME PRINCIPAL VEILLEUSE ALARME ALARME ALARME ALARME 00 VÉRIFICATION DE DÉMARRAGE DE SÉCURITÉ AFFICHAGE D...

Страница 26: ...OM HAUT AUTO BAS COM HAUT INTERRUPTEURS DE LIMITEURS INTERRUPTEUR DU BRÛLEUR VERROUILLAGE DE MARCHE CÂBLAGE TYPE DU D10 EP100 OU DU D20 EP200 VERROUILLAGE DE DÉMARRAGE BASSE COMBUSTION INTERRUPTEUR BALAYAGE INTERRUPTEUR PRINCIPAL ALARME DE VERROUILLAGE VANNE S DE COMBUSTIBLE PRINCIPALE S VANNE S À VEILLEUSE TRANSFORMATEUR D ALLUMAGE 1 1 1 1 1 1 1 2 3 3 2 2 UTILISÉ UNIQUEMENT SUR LES PROGRAMMEURS S...

Страница 27: ...ERNES MF32639 CAVALIERS DE CONFIGURATION TEMPORISATEUR DE BALAYAGE AMPLIFICATEUR DE FLAMME ALARME SOUFFLANTE VEILLEUSE INTERMITTENTET 1R1 3K1 6K1 A M 6 VANNE PRINCIPALE 7 LF D F G 17 L1 L1 L2 L2 VANNE DE VEILLEUSE INTERMITTENTE 15 S 5 4K1 7K1 2K2 1K1 P DÉBIT D AIR 3 13 LIMITEURS RÉGULATEUR 1R1 X 10 PRÉALLUMAGE 11 8K2 9K1 12 9K2 ...

Страница 28: ...T DE FLAMME PRINCIPALE VEILLEUSE FLAMME PRINCIPAL MARCHE ALIMEN TATION POSTBALAYAGE ALIMEN TATION VEILLE 00 00 10 25 00 15 20 ACTION DU MOTEUR MOTEUR DE BRÛLEUR SOUFFLANTE VANNE VEILLEUSE INTERMITTENTE LIMITEURS ET RÉGULATEUR DE BRÛLEUR FERMÉS VERROUILLAGES DE MARCHE FERMÉS VPA FERMÉ INTERRUPTEUR BASSE COMBUSTION VÉRIFICATION DE DÉMARRAGE DE SÉCURITÉ VÉRIFICATION DE FLAMME ALL VEILLEUSE 10 S 5 M 6...

Страница 29: ... parallèle avec vanne s motorisée s pour un total de 1150 VA à rotor bloqué appel 460 VA pour ouvrir et 250 VA pour le maintien ou vanne s motorisée s pour un total de 1500 VA à rotor bloqué appel 600 VA pour ouvrir et 250 VA pour le maintien L1 L2 S2 S1 A 8 7 6 5 13 12 X P D M 3 L2 N L1 L 11 10 DÉTECTEUR DE FLAMME UV MOTEUR DE BRÛLEUR SOUFFLANTE PREUVE DE FERMETURE DE VANNE PREUVE DE FERMETURE DE...

Страница 30: ... de verrouillage Circuit d allure de chauffe Prébalayage pour économie d énergie Organismes d homologation Veilleuse Principal R7120D 2000 10 s 4 ou 10 s 10 15 sa ou intermittent 15 s Préalllumage marche combustion basse Modulation 4 fils Non Modulation UL CSA R7120D 1002 10 ou 15 s Préallumage verrouillage combustion haute et basse Modulation FM IRI R7120D 3007 10 s ou intermittente Préallumage m...

Страница 31: ...lleuse veilleuse intermittente n est pas sous tension d La borne de terminaison d étincelle précoce est activée après 5 secondes e Aucune flamme n est présente à la fin de la période d établissement de la veilleuse f La borne de la vanne principale est sous tension R7120D2000 R7120D3007 g Une panne du système interne est survenue h La carte de balayage est enlevée i La carte de balayage est défect...

Страница 32: ...eu e Lorsque la temporisation de PRÉBALAYAGE est terminée le moteur d allure de combustion enclenche la combustion basse f Lorsque le moteur d allure de chauffe atteint la position basse combustion les bornes M à D de l interrupteur basse combustion sont activées pour passer en mode d essai d allumage REMARQUE Un maintien de 30 secondes a lieu pour un interrupteur basse combustion relié par cava l...

Страница 33: ...hauffe est en position haute combustion 3 Durant la période de prébalayage de passage à la position basse combustion l interrupteur Marche Test lorsqu il est placé sur la position TEST reste en PRÉBALAYAGE lorsque le moteur d allure de chauffe est en position basse combustion 4 En période d établissement de la veilleuse l interrupteur Marche Test lorsqu il est placé sur la position TEST arrête le ...

Страница 34: ...al du fabricant Limiter l essai de la veilleuse à dix secondes Limiter la tentative d allumage du brûleur principal à deux secondes après que le combustible a atteint la buse du brûleur Ne pas dépasser le temps d allumage nominal du fabricant IMPORTANT 1 Si le système ne fonctionne pas correctement noter le code de panne le message de panne le statut de l équipement et l heure de la séquence sur l...

Страница 35: ... d allumage sont propres f Fermer l interrupteur principal et observer l étincelle g Après obtention d une étincelle continue ouvrir l interrupteur principal et ajouter un cavalier sur la plaque de raccordement de la borne L1 à la borne de veilleuse 3 Rebrancher le fil de vanne de veilleuse s il a été débranché à l étape b h Fermer l interrupteur principal pour activer le transformateur d allumage...

Страница 36: ...DÉMARRAGE 5 Laisser la séquence avancer jusqu à PRÉBALAYAGE si applicable L étincelle d allumage doit avoir lieu lorsque la DEL Veilleuse s allume Écouter pour détecter le clic de l électrovanne de combustible de première étape Le module de relais se verrouille et la DEL Alarme s allume 6 Laisser le module de relais terminer son cycle 7 Ouvrir les vannes de coupure manuelles 8 Appuyer sur le bouto...

Страница 37: ...te pas réarmer le système et s assurer que l interrupteur Marche Test est en position de test durant les premières huit secondes de la séquence PILOT IGN IMPORTANT 0 8 seconde ou 3 secondes sont disponibles en fonction de la période d établissement de la veilleuse sélectionnée pour mettre l interrupteur Marche Test en position de Test pour arrêter la séquence après le début de la période PILOT IGN...

Страница 38: ...éfractaire chaud rectification des détecteurs photoélectroniques à infrarouge et à ultraviolets Cette condition peut retarder la réponse à une défaillance de flamme et peut aussi empêcher le système de se relancer si un élément réfractaire chaud est détecté Les détecteurs à infrarouge sulfure de plomb peuvent répondre aux infrarouges émis par un élément réfractaire chaud même si ce dernier a visib...

Страница 39: ...du brûleur principal seule et les deux ensembles à moins de ne contrôler que la flamme de la veilleuse si une veilleuse intermittente est utilisée ou seulement le brûleur principal lors de l utilisation d un allumage par étincelle direct Vérifier le signal en positions de combustion haute et basse et le cas échéant pendant la modulation Vérifier le temps de réponse en cas d extinction de l amplifi...

Страница 40: ...ales et ouvrir la ou les vannes de coupure manuelles de veilleuse b Appuyer sur le bouton de Réarmement c Démarrer le système Le démarrage doit s effectuer normalement et le brûleur principal doit s allumer normalement d Un fois la séquence en période MARCHE normale durant au moins dix secondes avec le brûleur principal allumé fermer la ou les vannes de coupure manuelles principales pour éteindre ...

Отзывы: