AMPS-24 Manual —
P/N 51907:J2 02/26/2014
17
In a BB-200 Cabinet
Installation
2.5 In a BB-200 Cabinet
The AMPS-24 mounts in a BB-200 cabinet with four 100 amp-hour batteries (two on the top shelf
and two on the bottom). The power supply is fastened directly to the unpainted section of the
backbox with two keps nuts.
BB2
00
_A
MP
S24
_
4B
at
tb.w
m
f
Figure 2.5 BB-200 Mounting
Fasten the AMPS-24
chassis to the backbox using the two
supplied #4-40 keps nuts (p/n 36045) at these positions.
!
WARNING: Heavy Load!
The total weight of a fully loaded BB-200 will exceed 300 pounds. Additional support may be required
when mounting this cabinet to a wall.
See BB-100/200 Cabinet Installation Instructions for more information.
Содержание Notifier AMPS-24/E
Страница 1: ...J2 P N 51907 J2 ECN 14 0161 Document 51907 02 26 2014 Rev Intelligent Power Supply AMPS 24 E Manual ...
Страница 39: ...AMPS 24 Manual P N 51907 J2 02 26 2014 39 Notes ...
Страница 40: ...40 AMPS 24 Manual P N 51907 J2 02 26 2014 Notes ...
Страница 50: ...50 AMPS 24 Manual P N 51907 J2 02 26 2014 X X Index ...