Multinode Module Service
4-3
9/95
4.2
NOTE
Before inserting a replacement board:
1. Make certain that the replacement board is at a revision level equal to or later than the
board being replaced.
2. Make certain that the pinning of the node address on a K2LCN board matches
that on the board being replaced.
4.2 ASSEMBLY
1. Assemble I/O boards (6) to rear chassis, taking care not to damage connectors, and
secure board retainers. Care should be taken to ensure that the I/O boards match the
primary boards. If present, reconnect cables to replaced boards.
2. Insert power supply (4) into chassis and secure retainers.
3. Insert fan assembly (5) into chassis and secure bail-headed screws.
4. Insert boards (2) into chassis and secure retainers. If present, reconnect ribbon cables
to replaced boards.
5. Assemble front panel (1) to chassis and secure quarter-turn fasteners.
Содержание MT13-520
Страница 1: ...L 8 Node Multinode Module Service MT13 520 ...
Страница 2: ......
Страница 8: ...Multinode Module Service ii 9 95 ...
Страница 28: ...Multinode Module Service 3 8 9 95 ...
Страница 30: ...Multinode Module Service 4 2 9 95 4 1 6 5 3 1 4 2 Figure 4 1 Multinode Module Exploded View 2888 ...
Страница 32: ...Multinode Module Service 4 4 9 95 ...
Страница 36: ...Multinode Module Service 5 4 9 95 ...
Страница 38: ...Multinode Module Service 6 2 9 95 ...
Страница 48: ...Multinode Module Service Index 2 9 95 ...
Страница 51: ......