Honeywell Kromschroder TC 1 Скачать руководство пользователя страница 7

GB-7

D

GB

F

NL

I

E

Setting measurement time t

M

 

The measurement time t

M

 can be set with a 

jumper in increments of 5 s to max. 30 s.

 

t

M

 is set to 30 s at the factory.

t

M

5s

10s

15s

20s

25s

30s

 

No jumper: no function. The 

1
2

Power

 LED is perma-

nently red, see page  8 (Assistance in the 
event of malfunction).

 

The longer the measurement time t

M

, the greater 

the sensitivity of the tightness control. The longer 
the measurement time, the smaller the leakage 
rate at which a safety shut-down/fault lock-out 
is triggered.

 

For all CG versions, the measurement 
time t

M

 must be set to 5 s on TC 1C.

 

If no leakage rate is specified, we recommend 
the max. measurement time is set.

 

Within the scope of the European Union, the 

maximum leakage rate Q

L

 is 0.1% of the maxi-

mum flow rate Q

max.

 [m

3

/h (n)].

 

If a leakage rate is specified, find the measure-
ment time t

M

 from the following:

 

 Q

max.

 = max. flow rate [m

3

/h]

 

 Q

L

 = Q

max. 

[m

3

/h] x 0.1% = leakage rate [ l/h]

 

 p

u

 = inlet pressure [mbar]

 

 V

P

 = test volume [ l ], see page 7 (Values for 

valve and pipe volume)

 

The tightness control TC requires a minimum 

start rate in order to carry out tightness tests 
on slow opening valves:

 

 up to 5 l (1.3 gal) test volume V

P

 = 5% of maxi-

mum flow rate Q

max.

, up to 12 l (3.12 gal) test 

volume V

P

 = 10% of maximum flow rate Q

max.

.

  

 Determine measurement time t

M

.

 

Measurement times t

M

 for V1 and V2:

t

M

 [s] =

2.5 x p

u

 [mbar] x V

P

  [ l ]

Q

L

  [ l /h]

 

The entire test period is made up of the meas-

urement times t

M

 of both valves and the fixed 

opening time t

L

 of both valves together:

t

P

 [s] = 2 x t

L

 + 2 x t

M

Values for valve and pipe volume

L

V

P

 = V

V

 + L  

x

  V

R

V

P

V1

V2

Valves

Valve 

volume 

V

V

 [ l ]

Nomi-

nal size

DN

Pipe  

volume V

R

 

[ l/m]

VG 10

0.01

10

0.1

VG 15

0.07

15

0.2

VG 20

0.12

20

0.3

VG 25

0.2

25

0.5

VG 40/VK 40

0.7

40

1.3

VG 50/VK 50

1.2

50

2

VG 65/VK 65

2

65

3.3

VG 80/VK 80

4

80

5

VG 100/VK 100

8.3

100

7.9

VK 125

13.6

125

12.3

VK 150

20

150

17.7

VK 200

42

200

31.4

VK 250

66

250

49

VAS 1

0.08

VAS 2

0.32

VAS 3

0.68

VAS 6

1.37

VAS 7

2.04

VAS 8

3.34

VAS 9

5.41

VCS 1

0.05

VCS 2

0.18

VCS 3

0.39

VCS 6

1.11

VCS 7

1.40

VCS 8

2.82

VCS 9

4.34

Calculation example:
 

 Q

max.

 = 100 m

3

/h 

 p

u

 = 100 mbar 

 V

P

 = V

V

 + L x V

R

 = 7 l 

 Q

L

 = 100 m

3

/h x 0.1% = 100 l/h

2.5 x 100 x 7

 = 17.5 s

100

 

 Set the next highest value (in this example 20 s) 
with the jumper.

  

 Disconnect the unit from the electrical power 

supply.

  

 Unscrew the housing cover.

 4 

 Set the jumper to the position for the required 

measurement time.

 5 

 Position the housing cover and screw tight.

 6 

 Mark the set measurement time t

M

 on the type 

label with a waterproof pen.

TC

D-49018 Osnabrück, Germany

t

M

(s)  5 10 15 20 25 30

 

The entire test period for this example is as fol-

lows: 2 x 3 s + 2 x 20 s = 46 s.

Содержание Kromschroder TC 1

Страница 1: ... Electrical interventions may only be carried out by qualified electricians Conversion spare parts All technical changes are prohibited Only use OEM spare parts Changes to edition 08 17 The following chapters have been changed Installation Wiring Certification Contents Operating instructions D GB GB 1 03251469 Translation from the German 2018 Elster GmbH Edition 04 18 Tightness control TC 1 TC 2 T...

Страница 2: ...2 3 For attachment to valVario For attachment to CG For quick opening individual valves For quick or slow opening valves R N With Rp internal thread With NPT internal thread 05 pu max 500 mbar W Q K Mains voltage 230 V AC 50 60 Hz 120 V AC 50 60 Hz 24 V DC W Q K Control voltage 230 V AC 50 60 Hz 120 V AC 50 60 Hz 24 V DC Part designations TC 1C TC 1V 2 1 1 4 2 3 1 TC 1V 2 Connectors 3 5 x M16 cabl...

Страница 3: ...h masonry Minimum clearance 20 mm 0 78 Use the O rings supplied In the case of very large test volumes VP an installed relief line should be of nominal size 40 to allow for the discharge of the test volume VP 1 Disconnect the system from the electrical power supply 2 Shut off the gas supply 4 3 5 The O rings must be inserted in the connectors of the TC Mounting TC 1V to valVario controls The solen...

Страница 4: ...mpensate the distance to the valve housing pu Only use approved sealing material to seal the pipe connections 250 Ncm pu 6 7 8 10 11 9 Connect the interspace pressure connection pz on the adapter plate to the space between the valves using a 12 x 1 5 or 8 x 1 pipe pz pz Ensure that connections pu and pz on the TC and adapter plate are not reversed 250 Ncm pu pz 6 7 8 10 11 Mounting TC 3 Connect th...

Страница 5: ...of the connection cable see page 10 Technical data CAUTION Please observe the following to ensure that the unit is not damaged during operation Avoid voltage and current peaks It is recommen ded to equip connected valves with a protective circuit in accordance with the manufacturer s instructions 1 Disconnect the system from the electrical power supply 2 Shut off the gas supply Before opening the ...

Страница 6: ...unit from the electrical power supply Before opening the unit the fitter should ground himself 2 Unscrew the housing cover 3 Set the test instant to Mode 1 2 or 3 Mode 1 tM 5s 10s 15s 20s 25s 30s Mode 1 test before burner start up with incom ing thermostat start up signal ϑ factory setting Mode 1 tM 5s 10s 15s 20s 25s 30s Mode 2 test after burner run when the thermo stat start up signal ϑ drops an...

Страница 7: ...e VP 10 of maximum flow rate Qmax 1 Determine measurement time tM Measurement times tM for V1 and V2 tM s 2 5 x pu mbar x VP l QL l h The entire test period is made up of the meas urement times tM of both valves and the fixed opening time tL of both valves together tP s 2 x tL 2 x tM Values for valve and pipe volume L VP VV L x VR VP V1 V2 Valves Valve volume VV l Nomi nal size DN Pipe volume VR l...

Страница 8: ...ntested valves the LEDs 1 2 Power and 1 2 Power are yellow There is mains voltage at terminal 1 and renewed test after switching off the voltage to terminal 10 thermostat start up signal ϑ During the test the 1 2 Power or 1 2 LED flashes yellow The 1 2 Power and 1 2 Power LEDs are green Both valves are tight Mode 1 or Mode 3 the enable signal is issued via terminal 6 when voltage is applied to ter...

Страница 9: ...emedy cause Then press the reset button 1 2 Power or 1 2 Power red and permanently lit The valve is leaking The TC performs a fault lock out Replace the valve Wiring of the TC to the valves is faulty Start the program and observe the interspace pressure pz The pressure must change during the TEST phase Check the wiring Inlet pressure pu 10 mbar Provide the min inlet pressure of 10 mbar Interspace ...

Страница 10: ...5 WC Measurement time tM 5 to 30 s adjustable Set at the factory to 30 s Medium and ambient temperatures 20 to 60 C 4 to 140 F No condensation permitted Long term use in the upper ambient temperature range accelerates the ageing of the elastomer materials and reduces the service life Storage temperature 20 to 40 C 4 to 104 F Max installation altitude 2000 m AMSL Mechanical data Length of connectio...

Страница 11: ...isposed of in ac cordance with local regulations Disposal Components are to be disposed of separately in accordance with local regulations Certification Declaration of conformity We the manufacturer hereby declare that the prod uct TC 1 3 with product ID No CE 0085CS0076 complies with the requirements of the listed Directives and Standards Directives 2014 35 EU LVD 2014 30 EU EMC Regulation EU 201...

Страница 12: ...stoms Union SIL PL For systems up to SIL 3 pursuant to EN 61508 Pursuant to EN ISO 13849 1 Table 4 TC 1 TC 2 and TC 3 can be used up to PL e Safety specific characteristic values Mains and control voltage 120 V AC 230 V AC Diagnostic coverage DC 91 4 Mean probability of danger ous failure PFHD 17 3 x 10 9 1 h Mains voltage 120 V AC 230 V AC control voltage 24 V DC Diagnostic coverage DC 91 3 Mean ...

Отзывы: