3.2 Power and grounding requirements
3.3 Cabinet spacing requirements
3.4 Installing the server and connecting the cables
3.4.1 Honeywell server back panel connections
3.4.4 Install air duct baffles and blank panel front covers in cabinet
3.5.2 Configuring RAID in HP ProLiant DL360p Gen8 server
3.5.3 Starting the TDC emulator services
3.5.4 Checking the LCNP4e/LCNp4e2 status
4.3 Configuring ControlNet interface card
5.1 Remove the server from the rack
5.3 Servicing the LCNP4e/LCNp4e2
5.3.1 Replacing the LCNP4e/LCNp4e2 board
5.4 Servicing the hard disk drives and power supply
5.4.1 Installing hot spare hard drive
5.5 Servicing Honeywell options
5.5.1 LCN node setup board configuration
5.5.2 Slot requirements for general Ethernet and FTE node setup
5.5.4 Verifying correct BIOS settings
- 4 -