I
NSTALLATION
This section describes the procedures for installing the platform and cabling the server in a 1-meter
deep Honeywell cabinet.
l
Tasks for installing the server
l
Power and grounding requirements
l
l
Installing the server and connecting the cables
l
3.1
Tasks for installing the server
The following table lists the major platform installation tasks.
Checklist Tasks
Understanding the Power and grounding requirements. Also refer to,
TPN
System Installation Guide (SW20-600).
Installing the server and connecting the cables
l
3.1.1
Before you begin
Ensure that you perform the following tasks.
l
Ensure that the cabinet is properly grounded
l
Unpack the platform from the box and verify the parts
l
Place the server on a secure surface near the cabinet to mount
l
Ensure that you have the necessary cables ready
3.2
Power and grounding requirements
The ground connection is made through the third wire in the AC power cord.
- 26 -
CHAPTER
3