MLSUC500 / 1250 Installation Guide 32340084-001 Rev A, 24-Aug-2018. MU1B-0638GE51 R0718A

MLSUC500 / 1250 

Installation Guide

© 2018 Novar ED&S Limited.

Honeywell Ex-Or reserves the right to revise this publication from time to time and make changes to the content hereof without obligation to notify any 

person of such revisions or changes.

Honeywell Ex-Or

St. Mark’s Court, North Street, Horsham, West Sussex, RH12 1BW, UK. Tel:+44 (0)1403 211888 Fax:+44 (0)1403 241608 www.ex-or.com

   

8

Check STAT & BEAT Indicators

9

Configure MLSUC500 / 1250

7

Switch On Power to MLSUC500 / 1250

6 DISPOSAL

WEEE Directive:

At the end of their useful life the packaging and 

product should be disposed of by a suitable 

recycling centre.

Do not dispose of with normal household waste.

Do not burn.

FIELD MAINTENANCE

MLSUC500 / 1250 requires no routine maintenance.

!

WARNING: 

Contains no serviceable parts. Do not 

attempt to open the unit. Failure to comply may 

cause damage to the unit.

3 INSTALLATION 

(continued)

MLSUC500 / 1250 Configuration Manual (W6003)

The following information will be useful;

• 

RB2000 locations.

• 

Zones and their respective RB2000 address must be clearly marked.

• 

The Ballast type and timeout period should also be listed.

• 

Zone identities. Such as room names or numbers.

• 

LCM locations.

• 

Emergency Ballasts.

Some of this information may only be available from those who commission the MLS 

lighting control system which may or may not be an Ex-Or commissioning Engineer.

Normal operation indication

STAT

BEAT

Fault indications

STAT

Contact technical support.

BEAT

 or 

Contact technical support.

STAT BEAT

30s

O

I

Содержание Ex-Or MLSUC500

Страница 1: ...500 1250 Installation Instructions Mounting 32340084 001 and enclosure mounting instructions 4 Field Maintenance 4 5 Disposal 4 H O 2 85 C 5 40 C 95 RH 185 mm 7 25 300 mm 11 75 Allow Cover clearance Unit with door open It is recommended that the installation should comply with the local electrical safety installation practices e g HSE Memorandum of Guidance on Electricity at Work Regulations 1989 ...

Страница 2: ...ocation subject to electrical noise H O 2 60 C 5 20 C 95 RH The entry for the power wiring can be made by drilling a conduit of around 20mm at the bottom or either side of the enclosure The power wiring must be terminated at the MLS power terminals and circuit breaker and terminal blocks The MCB and the terminal blocks are prewired to the MLSJ8 PSU in the factory Note the MLS circuit breaker and M...

Страница 3: ...In that event disconnect it from the network segment and power cycle the MLSUC500 1250 32 devices RS 485 The MLSUC500 1250 assumes the role of Bus Master on the MLS Spine This means that all the RB2000s should be given consecutive unique non zero addresses refer to RB2000 documents The last unit at each end of the MLS spine should be configured to terminate the two RS485 signal pairs A B and Y Z I...

Страница 4: ...ycling centre Do not dispose of with normal household waste Do not burn 5 FIELD MAINTENANCE MLSUC500 1250 requires no routine maintenance WARNING Contains no serviceable parts Do not attempt to open the unit Failure to comply may cause damage to the unit 3 INSTALLATION continued MLSUC500 1250 Configuration Manual W6003 The following information will be useful RB2000 locations Zones and their respe...

Отзывы: