background image

Installation and Commissioning

Instructions

Note: HP2000 required for commissioning

Gold Series LightSpot

for use with Analogue 1-10V ballasts 

MS2421A

MS2421ASM

MS2421AF

Содержание Ex-Or LightSpot Gold Series

Страница 1: ...Installation and Commissioning Instructions Note HP2000 required for commissioning Gold Series LightSpot for use with Analogue 1 10V ballasts MS2421A MS2421ASM MS2421AF ...

Страница 2: ...the PCELL RLY action should be set to DISABLED and the lights will be on continuously during periods of occupancy The Analogue 1 10V output dims the ballast s in the luminaires It always tries to maintain a programmed light level on the working plane It aims for the level stored in the parameter Set point Low Sometimes it is convenient to limit the extent to which the presence detector with photoc...

Страница 3: ...ght level falls below Set point Low during a period of occupancy then the lights are switched on immediately without any delay Programming the Set points 1 Simple PCELLRLYSwitching Control i If PCELL RLY ACTIVE switching action is required it is important that the lights are switched on at least 15 minutes before this procedure is undertaken to allow the tubes to reach full output For PCELL RLY PA...

Страница 4: ...respect as mains with regard to wiring practice The 0V line of the dimming output is almost at Neutral potential 4 The dimming control output should be connected only to the control input of the ballasts never to other detectors 5 Due to the fact that the photocell is on the ceiling looking down it is not possible for measurements made with a lux meter on the working plane to remain constant when ...

Отзывы: