
10 - 5
The following illustration shows how to install the ferrite on the cable. It should be placed approximately
1.57 inches (40mm) from the RJ45 plug. The cable should be looped around the core, as shown.
Charging the Main Battery
The base powers the terminal and fully charges its main
battery pack in an average of 5 1/2 hours for a fully depleted
battery. It takes less time if the battery has some charge.
As battery packs charge, the charging circuitry follows the two-
step charging process (CC-CV) that is recommended for Li-Ion
batteries. The process monitors changes in temperature,
current, and voltage.
Inserting a Terminal
1.
Install the battery pack in the terminal; see
2.
3.
Slide the terminal into the terminal well making certain
that the terminal is seated properly.
4.
The battery pack begins charging.
Ensure all components are dry prior to mating terminals/
batteries with peripheral devices. Mating wet components may cause damage not covered by the warranty
.
!!
Содержание DOLPHIN 6100
Страница 1: ...Dolphin 6100 Mobile Computer with Windows Embedded Handheld 6 5 User s Guide ...
Страница 6: ...vi Limited Warranty 12 3 Limited Warranty Duration 12 3 How to Extend Your Warranty 12 4 ...
Страница 18: ...2 8 ...
Страница 46: ...5 6 ...
Страница 66: ...7 18 ...
Страница 94: ...10 8 ...
Страница 103: ......
Страница 104: ... Honeywell Scanning Mobility 9680 Old Bailes Road Fort Mill SC 29707 www honeywellaidc com 61 WEH6 UG Rev A 9 11 ...