6
- With the sling still tied, fit the
modules to the base with M24
screws.
7
- At the access
levels, the guardrails
are positioned so as
to privilege access by
the main face A (face
names shown on the
sticker). Finally the
erection guardrails are rotated to
a vertical position and locked onto
the stairs above . Before untying
the slings, anchor the Escalib.
The last step
used should
ideally be
placed 21 cm
lower than the
floor being
serviced.
REQUIREMENTS:
> Remove the anchorages as the
Escalib is beeing dismantled.
> Dismantle in the reverse order of
assembly.
WARNING:
The erection guardrail must not be used as a substitute for the barrier gate.
WWW.COMBISAFE.COM
8
8
- Fill the Pre-Use Inspection Report