Honeywell AQ252 Series Скачать руководство пользователя страница 9

AQ252 Universal Injection/Mixing Boiler Reset Control Panels

11

69-1986—02

Fig. 9. Connecting thermostats.

Step 4 – Zoning Equipment Wiring

Because the Zoning Module of the AQ25242B Control Panel 
can be used with either line voltage pumps or valves, or low 
voltage zone valves (with or without end switches), field 
installed wiring of the correct voltage needs to be connected to 
the zoning equipment terminals on the bottom left portion of 
the Zoning Module.

Line Voltage – Circulators or Zone Valves

Refer to Fig. 10. Remove the plastic wiring barrier that is 
located in the bottom wiring channel between the AQ15200B 
Control Module and the Zoning Module. Run jumper wires from 
the N and L terminals on the bottom of the AQ252 Control 
Panel’s transformer, through the wiring channel across the 
bottom of the Control Panel, and to the corresponding N and L 
terminals of the Zoning Module. 

Fig. 10. Wiring an AQ15540B Zoning Module for use 

with line voltage circulators.

Low Voltage – Zone Valves With or Without End 
Switches 

Wire using step 1 for zone valves without end switches, or use 
step 2 for zone valves with end switches:

1.

Low voltage zone valves without end switches:
Using Fig. 12 on page 11 as a guide, run jumper wires 
from the R and C terminals on the secondary of the 
AQ252’s transformer, through the wiring channel across 

the top of the Control Panel, and down through the wiring 
channel on the right side of the panel and over to the R 
and C terminals on the bottom of the Zoning Module.

IMPORTANT

If low voltage zone valves are used with the 
AQ25242B Control Panel, the supplied Low Voltage 
Output sticker (shown in Fig. 11) 
must be applied over 
the line voltage output sticker (see Fig. 10) 
that is 
already attached to the Zoning Module.

Fig. 11. Low voltage output sticker.

Fig. 12. Wiring an AQ15540B Zoning Module for use 

with low voltage zone valves without end switches.

2.

Low voltage zone valves with end switches:
See Fig. 13. 24 Vac power is pre-wired between the 
transformer secondary at the top left of the AQ252’s 
transformer and the AQ15740B Zoning Module. No field 
wiring is required. 

Fig. 13. Wiring an AQ15740B Zoning Module for use

with low voltage zone valves with end switches.

NOTE:

When wiring zone valves with end switches, note the 
transformer's VA:

I

f low voltage zone valves with end switches are used 

for zone control, make sure the selected zone valves 
do not draw more power (VA) than the 38 VA capacity 
of the AQ10X38 transformer supplied with the AQ252 
Control Panel. This integral transformer has enough 
power to operate 4 motorized zone valves (such as 
Honeywell V8043E valves or 4 valves using low-
amperage draw, heat motor actuators, such as 
Honeywell MV100 actuators), plus power the 
electronics of the AQ252's Control Module and up to 

FROM B-B “EXP

. BUS”

TERMINALS ON 

CONTROL

 MODULE  

T

O

 B-B “EXP

. BUS IN” 

TERMINALS 

ON CONNECTED ZONING MODULE 

(IF 

AN EXP

ANSION ZONING P

ANEL

 

IS CONNECTED) 

THERMOST

A

T

 ON ZONE 1 

THERMOST

A

T

 ON ZONE 2 

THERMOST

A

T

 ON ZONE 3 

THERMOST

A

T

 ON ZONE 4 

M13776C

FROM LINE VOLTAGE 
120V TERMINALS 
(N AND L) ON BOTTOM 
OF TRANSFORMER

M27687A

M27688A

FROM LOW VOLTAGE 
24 VAC TERMINALS 
(C AND R) ON TOP 
OF TRANSFORMER

M27689A

M

M27690A

M

M

M

Содержание AQ252 Series

Страница 1: ...tor at 77 F 25 C 0 5 F 0 3 C Lead length 15 ft 4 6 m up to 500 ft 150 m using 18 AWG or larger wire beta 3892 Dimensions HxWxD 8 x 16 1 2 x 3 3 8 in 20 3 x 42 x 8 5 cm approximate Weight 4 9 lb 2 3 kg Approvals Canadian Standards Association Certified File No LR76030 1 INSTALLATION PREPARATION NOTES Throughout these instructions the following terminology conventions are used AQ155 refers to the AQ...

Страница 2: ...ry loop as well as coordinating the overall operation of the hydronic system 3 One of two different 4 zone Zoning Modules AQ15740B part of the AQ25244B Control Panel for zoning with 24 Vac zone valves with end switches AQ15540B part of the AQ25242B Control Panel for zoning with either line voltage circulators or 24 Vac zone valves without end switches AQ252 Control Panels can control a maximum of ...

Страница 3: ... Remove wire channel plugs from the AQ252 Control Panel and any Expansion Zoning Panels see Fig 3 2 Mount Expansion Zoning Panel on the right hand end of the AQ252 Control Panel Install two top screws of the Expansion Zoning Panel ensuring it is level with the adjoining Control Panel and install two lower screws 3 Reverse wire channel plugs and re insert them into their slot to form a wiring chann...

Страница 4: ...ixing Boiler Reset Control Panels 69 1986 02 6 Fig 3 Orientation of wire channel plugs for creating pass through wire channel and for joining Control Panel to Expansion Zoning Panels M23733A WIRE CHANNEL PLUGS WIRE CHANNEL PLUGS ...

Страница 5: ...l Module as well as the R and C inputs of the Zoning Module The B B Exp Bus terminals 26 and 27 of the Control Module are wired to the B B Exp Bus IN terminals of the Zoning Module Beginning with the top left of Fig 4 and moving clockwise around the panel wire components to the AQ252 Control Panel and Expansion Zoning Panels if installed in the following six steps Step 1 Transformer Wiring Step 2 ...

Страница 6: ...plicing SECONDARY MIXED LOOP SUPPLY SENSOR The secondary sensor should be installed on the secondary mixed water piping far enough downstream of the mixing device that the return water from the mixed loop and the boiler loop water are sufficiently well mixed but before it flows through a branch leading to a zoning pump zoning valve or manifold The sensor used for the secondary loop is the same typ...

Страница 7: ...utes of a call for heat and then allows the space heating needs to be added in for the next 30 minutes This cycle continues until the call for heat is satisfied DOMESTIC HOT WATER Wire the DHW terminals 15 and16 to the Aquastat or thermostat on the domestic hot water tank DHW priority allows only DHW heat for the first 30 minutes of a call for DHW and then allows the space heating needs to be adde...

Страница 8: ...c non communicating thermostats or AQ1000 communicating thermostats 1 Using low voltage thermostat wire connect one thermo stat from each zone to the corresponding THERMO STATS Zone X inputs on top of the Zoning Module see Fig 9 2 If there are additional zones on Expansion Zoning Panels connected to this Zoning Module run low voltage thermostat wiring from the B B Exp Bus Out connection terminals ...

Страница 9: ... Module IMPORTANT If low voltage zone valves are used with the AQ25242B Control Panel the supplied Low Voltage Output sticker shown in Fig 11 must be applied over the line voltage output sticker see Fig 10 that is already attached to the Zoning Module Fig 11 Low voltage output sticker Fig 12 Wiring an AQ15540B Zoning Module for use with low voltage zone valves without end switches 2 Low voltage zo...

Страница 10: ...o a set of dry contacts such as a zone valve motor s end switch If power is applied to these contacts for example by running line voltage through the zone valves end switches to bring on a circulator feeding those valves the internal circuitry of the Zoning Module will be damaged in which case the warranty for this product will be voided Fig 14 Wiring of additional low voltage VA capacity THERMOST...

Страница 11: ... zone valve wire the primary of a spud mounted transformer 115V to 24V to the DHW line voltage contacts and connect the low voltage zone valve to the secondary terminals of this transformer A spud mounted transformer may be located in one of the conduit knockouts on the bottom of the AQ252 Control Panel Alternatively a 24 Vac zone valve can be connected to the Aux pump line voltage rated dry conta...

Страница 12: ...17 The ground wire of the pump can be connected to any of the 8 ground screw terminals located on the back surface of the Control Panel enclosure The secondary pump terminals energize only when a zone that has been designated as a secondary zone has a call for heat This enables the pump and the mixing device you have chosen for the loop control Set up is enabled in the EQUIPMENT SETUP PRI SEC sub ...

Страница 13: ...hey are suitable for the job rather than having to input all the settings from scratch Although these factory default values for the Control Module and each Zoning Module are suitable for many installations Honeywell recommends that they be reviewed and changed as necessary to get optimal performance of the hydronic system controlled by the AQ2000 Series products Zoning Module DIP Switch Location ...

Страница 14: ... Control Panel and the cover of each Expansion Zoning Panel NOTE The snap on DIP switch covers are designed so they cannot be removed exposing the DIP switches when the front cover of the AQ252 Control Panel is in place Table 2 AQ15540B Zoning Module Pump Zoning Module DIP Switch Arrangement DIP Switch Switch Description Label and Factory Settings 1 2 3 4 Zone Address The positions of these 4 DIP ...

Страница 15: ...ilable options one at a time LCD Display The LCD on the AQ252 Control Panel is used to Monitor system status and performance Select and or modify control settings for the hydronic system Diagnose and troubleshoot system problems The layout of the display is logical and simple to navigate The information displays so that the installer can see at a glance the system s operating temperatures as well ...

Страница 16: ...DHW sensor use Detail view is the factory default setting for the Home Page The choice of the Simple or Detail Home Page view is made from the USER MENU PREFERENCES TIME menu option The Home Page together with the System Status information a selection from the User Menu provides a service contractor extensive diagnostic information for troubleshooting the installation NOTES Home Page display upon ...

Страница 17: ...ws and v position the indicator arrow beside that output and press the button to begin testing Press the button to de activate the output relay and stop its test Any combination of outputs can be activated at the same time when testing the outputs When finished testing the outputs press the Menu button to return to the TEST AND PURGE sub menu TEST SENSORS When TEST SENSORS is selected the AQ252 LC...

Страница 18: ...URGE TIME which selected from the EQUIPMENT SETUP TEST AND PURGE PURGE sub menu The purge time can be adjusted in increments of 1 minute up to a maximum of 30 minutes per loop to be purged After you have defined which loops to purge all loops or an individual loop and for how long using the AQ252 s menus position the indicator arrow beside the START PURGE option and press the OK button The START P...

Отзывы: