EN
46
MU2H-0501ge23 R1020
V1.00 / 3.5.2018
1
2
3
4
Sealing the device
Commissioning after installation
• Open the ball valves, switch the heating on and open the radiator valve.
• Check the installation for airtightness and direction of flow.
• Seal the temperature sensor and flow sensor to protect it from manipulation.
• Note the installation date, the meter numbers, any seal numbers, the old and
new meter readings.
• Dispose of the used device in accordance with national regulations.
Sealing flow sensors
(1) Thread the seal wire through the seal holes in the
union nut on the inlet and wind at least 1x round the flow sensor.
(2) Insert the wire through the available opening in the seal body.
(3) Wind the wire tightly by turning the wing in the seal.
(4) Break the wing off the seal.
Sealing is guaranteed by breaking the seal off.
Содержание resideo EW701
Страница 2: ...2 MU2H 0501ge23 R1020 V1 00 3 5 2018 2020 Resideo Techonologies...
Страница 4: ...V1 00 3 5 2018 MU2H 0501ge23 R1020 3...
Страница 218: ...216 MU2H 0501ge23 R1020 V1 00 3 5 2018 Dimensions EWA600C MBUS 78 48 10 8 28 4 34 1...
Страница 219: ...V1 00 3 5 2018 MU2H 0501ge23 R1020 217 Dimensions EWA600C RF 78 48 11 29...
Страница 222: ...220 MU2H 0501ge23 R1020 V1 00 3 5 2018 FUM5HWHEDES EW701...