background image

HPSR10*

3

33-00331EF—08

WIRING AND SETUP

Power Input

Hydronic Panels include a convenient wiring terminal for 
wiring 120V/60Hz/1Ph power. These terminals, found at 
the bottom left side of the panel, provide power to the 
transformer and all pumps installed on the system.

Status Indicators

Hydronic Panels feature Advanced Status Lighting. This 
includes a transformer status light on the status panel, 
and an Input Power Status Light near the bottom left 
corner of the Zone Panel. These indicators show the Power 
Status of the Panel at all times. 

NOTE:

Line volt LED is not visible with mylar cover 
installed. 

Zone Pump

Hydronic Panels are compatible with common zone 
Pumps and can be wired in as show in the wiring diagrams 
on pages 4 and 5.

Thermostat Compatibility

THE HPSR10* zone panels are compatible with electronic, 
power stealing, and electro mechanical thermostats. 
Dedicated R and W terminals provide heat call messages 
from the thermostat to the zone panel and with C terminal 
may also provide auxiliary 24V power to electronic 
thermostats.

NOTE:

It is up to the installer to ensure that the 40VA per 
transformer limit is not exceeded. 

Additionally Hydronic Panels are compatible with 
Equipment Interface Modules in installations where 
sufficient wiring is not available.  

Fig. 8. 

NOTE:

For power stealing thermostats, wire to R and W 
on the zone panel. There are no additional com-
ponents required to make these thermostats 
function. For all thermostats that require a C wire 
for power there is a C terminal available on the 
panel for each thermostat.

Priority Override

Hydronic Panels support priority operation and can be 
enabled with the use of a switch located in the top right 
section of the panel labeled "Priority Zone".

When priority operation is enabled, the panel employs a 
priority override function which operates as shown below:

1.

If a priority zone calls for 60 continuous minutes, 
priority operation is disabled and control is returned 
to each zone. 

2.

Once the priority zone satisfies, priority override is 
disabled and standard operation resumes. 

Grounding

A grounding bar has been provided below pump 
connection terminal blocks. 

 

R: 24V Hot (Commonly Red)

 

W: Heat (Commonly White)

 

C: Common 24V (Commonly Blue)

R W C

M37090

Содержание HPSR10 Series

Страница 1: ...essionals only PANEL SPECIFICATIONS Table 1 NOTES All circulator relay connections including ZC ZR are rated for 5A full load and 30A locked rotor 1 6 to 1 2HP depending on technology at 120VAC Check...

Страница 2: ...screws in Fig 3 Din Rail Flow 1 Mount the DIN rail as per manufacturers instruc tions Fig 4 2 Hang panel by the tabs on the rail s top edge Fig 5 3 Snap into rail by pressing the bottom of panel again...

Страница 3: ...power to electronic thermostats NOTE It is up to the installer to ensure that the 40VA per transformer limit is not exceeded Additionally Hydronic Panels are compatible with Equipment Interface Modul...

Страница 4: ...6 Power Boiler End Switch HWSR506 6 ZONE PUMP CONTROLLER ZR ZC 2 AMP TRANSFORMER FUSE ZONE 1 FUSE ZONE 2 FUSE ZONE 3 FUSE ZONE 4 FUSE ZONE 5 FUSE PRIORITY END SWITCH PRIORITY END SWITCH PRIORITY ZONE...

Страница 5: ...wired to the boiler Fig 11 Fig 12 Fig 13 T STAT CALL STATUS OF ZR ZC CLOSED BOILER RELAY ON END SWITCH ON ZONE PUMP OFF OPEN NO PRIORITY ZONE OR PRIORITY END SWITCH BOILER RELAY ON END SWITCH ON ZONE...

Страница 6: ...calling for heat Table 2 Color Chart REGULATORY INFORMATION This device complies with part 15 of the FCC rules Operation is subject to the following two conditions 1 This device may not cause harmful...

Страница 7: ...ar des professionnels seulement SP CIFICATIONS DU PANNEAU Tableau 1 REMARQUE Tous les raccordements du relais du circulateur y compris les ZC ZR sont adapt s un rotor bloqu de 30 A et une charge nomin...

Страница 8: ...ail DIN 1 Montez le rail DIN conform ment aux instructions du fabricant Fig 4 2 Suspendez le panneau par les languettes sur le bord sup rieur du rail Fig 5 3 Embo tez le panneau dans le rail en appuya...

Страница 9: ...troniques qui ont besoin de l alimentation REMARQUE il incombe l installateur de veiller ce que la limite de 40 VA par transformateur ne soit pas d pass e En outre les panneaux hydroniques sont compat...

Страница 10: ...SIBLE ZONE 1 FUSIBLE ZONE 2 FUSIBLE ZONE 3 FUSIBLE ZONE 4 FUSIBLE ZONE 5 INTERRUPTEUR D EXTR MIT PRIORITAIRE INTERRUPTEUR D EXTR MIT PRIORITAIRE ZONE PRIORITAIRE ZONE 1 PRIORIT ZONE 2 ZONE 3 ZONE 4 ZO...

Страница 11: ...CHAUDI RE MARCHE INTERRUPTEUR D EXTR MIT MARCHE POMPE DE LA ZONE MARCHE OUVERT RELAIS DE LA CHAUDI RE MARCHE INTERRUPTEUR D EXTR MIT MARCHE POMPE DE LA ZONE ARR T MF37144 ZONE PRIORITAIRE AUCUN INTER...

Страница 12: ...as causer d interf rences dangereuses et 2 ce dispositif ne doit accepter aucune interf rence re ue notamment les interf rences l origine d un fonctionnement ind sirable Couvercle en mylar Fig 15 Couv...

Отзывы: