OPERATION
STANDBY POWER
Connections to a Building’s Electrical System
System Ground
Connections for standby power to a building’s electrical system must
be made by a qualified electrician. The connection must isolate the
generator power from utility power, and must comply with all
applicable laws and electrical codes.
Improper connections to a building’s
electrical system can allow current
from the generator to backfeed into
the utility lines.
Such backfeed may electrocute
utility company workers or others
who contact the lines during a
power outage, and the generator
may explode, burn, or cause fires
when utility power is restored.
Consult the utility company or a
qualified electrician prior to making
any power connections.
In some areas, generators are required by law to be registered with
local utility companies. Check local regulations for proper registration
and use procedures.
Honda portable generators have a system ground that connects the
generator frame components to the ground terminals in the AC output
receptacles. The system ground is not connected to the AC neutral
wire. If the generator is tested with a receptacle tester, it will not show
the same ground circuit condition as for a home receptacle.
10/03/11 12:59:41 31ZT3620_039
Содержание EU 1000i
Страница 1: ......
Страница 12: ...10 GENERATOR SAFETY 10 03 11 12 56 08 31ZT3620_011 ...
Страница 14: ...12 CONTROLS FEATURES MUFFLER SPARK PLUG MAINTENANCE COVER SPARK PLUG 10 03 11 12 56 17 31ZT3620_013 ...
Страница 73: ...71 TECHNICAL CONSUMER INFORMATION Wiring Diagram 10 03 11 13 04 26 31ZT3620_072 ...
Страница 90: ...88 MEMO 10 03 11 13 06 27 31ZT3620_089 ...
Страница 92: ......