OPERATION
AC PARALLEL OPERATION
Before connecting an appliance to either generator, make sure that the
appliance is in good working order and that its electrical rating does not
exceed that of the receptacle.
Most motorized appliances require more than their electrical rating for
startup. When an electric motor is started, the OVERLOAD ALARM
indicator (red) may come ON. This is normal if the OVERLOAD ALARM
indicator (red) goes OFF within 5 seconds. If the OVERLOAD ALARM
indicator (red) stays ON, consult your generator dealer.
During parallel operation, the Eco-Throttle switch should be in the same
position on both generators.
1. Install the parallel kit on the frame of one generator.
Connect the parallel operation cable between two EU7000is
generators following the instructions supplied with the parallel kit.
2. Set the voltage selector switch of both generators to 120 V/240 V.
PARALLEL KIT
(optional equipment, see page 82)
VOLTAGE SELECTOR SWITCH
120 V/240 V
31Z37613.book 43 ページ 2015年12月2日 水曜日 午前10時45分
Содержание DS-2CC102P(N)-IRT
Страница 83: ...81 TECHNICAL INFORMATION Wiring Diagram 31Z37613 book 81 ページ 2015年12月2日 水曜日 午前10時45分 ...
Страница 113: ...111 MEMO 31Z37613 book 111 ページ 2015年12月2日 水曜日 午前10時45分 ...
Страница 114: ...112 MEMO 31Z37613 book 112 ページ 2015年12月2日 水曜日 午前10時45分 ...
Страница 115: ...31Z37600 00X31 Z37 6000 2e XXX XXX XX Printed in XXXX 00X31 Z37 6130 AHM 35 2014 11 PRINTED IN U S A ...