49
STARTING THE ENGINE
6. Remove the two 6 mm cap nuts,
two washers, two 6 mm flange
bolts and two washers. Remove the
recoil case.
Take care not to lose the bolts, nuts
and washers.
7. Install and tighten the 6 mm flange
bolts by hand.
8. Hook the throttle cables to the
cable hook.
9. Hook the neutral start cable to the
under case.
RECOIL
CASE
6 mm FLANGE
BOLTS AND
WASHERS
6 mm CAP
NUTS AND
WASHERS
6 mm FLANGE BOLT
(Tighten by hand)
THOROTTLE CABLES
CABLE HOOK
NEUTRAL START CABLE
6 mm FLANGE BOLT
(Tighten by hand)
32ZVC6000.book Page 49 Thursday, April 28, 2016 10:51 AM
Содержание BF4A
Страница 105: ...105 18 EC DECLARATION OF CONFORMITY CONTENT OUTLINE 32ZVC6000 book Page 105 Thursday April 28 2016 10 51 AM ...
Страница 106: ...106 EC DECLARATION OF CONFORMITY CONTENT OUTLINE 32ZVC6000 book Page 106 Thursday April 28 2016 10 51 AM ...
Страница 107: ...107 EC DECLARATION OF CONFORMITY CONTENT OUTLINE 32ZVC6000 book Page 107 Thursday April 28 2016 10 51 AM ...
Страница 108: ...108 EC DECLARATION OF CONFORMITY CONTENT OUTLINE 32ZVC6000 book Page 108 Thursday April 28 2016 10 51 AM ...
Страница 109: ...109 EC DECLARATION OF CONFORMITY CONTENT OUTLINE 32ZVC6000 book Page 109 Thursday April 28 2016 10 51 AM ...