6
Installa�on Guide
Hot
Hand
shower
Shower
head
Cold
FACE OF STUD
STEP 1: SHUT OFF WATER SUPPLIES
STEP 2: PIPE CONNECTION
a Pipe material: Plas�c/Metal.
a
Confirm the installed place of the pressure balance valve on the
wood block.
b Note: The water inlet pipe shall not be connected reversely. It is
required to be hot on the le� and cold on the right.
c Note: When using metal pipe for welding connec�on, the valve
core, check valve and other plas�c parts must be removed.
b
Confirm
the thickness of your installa�on back plate.
c During installa�on ensure that the word “UP” is on top and
valve’s plane is perpendicular to the ground.
STEP 3: INSTALL THE VALVE BODY & WATER PIPE
STEP 4: PIPELINE FLUSHING
a
Remove the protec�ve cover. Unscrew the fixing screws on the
valve body protec�ve cover with Phillips Screwdriver. And bring two
self-tapping screws (M4*35mm) to lock the valve body.
b Connect the hot(le�) & cold(right) inlet tube and outlet tube,
ensure the tube fix is stable on the wooden block.
c Reinstall the protec�ve cover to prevent damage to the valve body.
a
Remove the check valve, open the water supply source and flush
the pipeline.
b A�er flushing, close the water supply and reinstall the check valve.
d Turn off the water supply a�er tes�ng.
c Reopen the water supply source, and check that there is no
leakage at the pipeline and all connec�ons of the pipeline.