background image

6

Installa�on Guide

  

 

 

Hot

Hand 

shower

Shower 

 head

Cold

FACE OF STUD

STEP 1: SHUT OFF WATER SUPPLIES

STEP 2: PIPE CONNECTION

a Pipe material: Plas�c/Metal.

Confirm the installed place of the pressure balance valve on the 

wood block.

b Note: The water inlet pipe shall not be connected reversely. It is 

required to be hot on the le� and cold on the right.

c Note: When using metal pipe for welding connec�on, the valve 

core, check valve and other plas�c parts must be removed.

Confirm

 

the thickness of your installa�on back plate.

c During installa�on ensure that the word “UP” is on top and 

valve’s plane is perpendicular to the ground.

STEP 3: INSTALL THE VALVE BODY & WATER PIPE

STEP 4: PIPELINE FLUSHING

Remove the protec�ve cover. Unscrew the fixing screws on the 

valve body protec�ve cover with Phillips Screwdriver. And bring two 

self-tapping screws (M4*35mm) to lock the valve body.
b  Connect  the  hot(le�)  &  cold(right)  inlet  tube  and  outlet  tube, 

ensure the tube fix is stable on the wooden block.
c Reinstall the protec�ve cover to prevent damage to the valve body.

Remove the check valve, open the water supply source and flush 

the pipeline.

b A�er flushing, close the water supply and reinstall the check valve.

d Turn off the water supply a�er tes�ng.

c Reopen the water supply source, and check that there is no

leakage at the pipeline and all connec�ons of the pipeline.

Содержание 4870004A5A

Страница 1: ...INSTALLATION MANUAL Wall Mount Dual Shower Heads 9C30004A59 4870004A5A www homluxproducts com...

Страница 2: ...product is completely installed If you have any ques ons require technical assistance or have any problems with your product If for any reason this product does not meet your expectations please be su...

Страница 3: ...defeat the ability of the valve to balance the hot and cold water pressures and could increase the risk of a burn injury NOTICE TO INSTALLER CAUTION As the installer of this valve it is your responsi...

Страница 4: ...s by checking the diagram and parts list If any part is missing or damaged please contact our Customer Service Supply lines should be purged to clean impuri es before connec ng the unit The hot water...

Страница 5: ...5 Note Make sure you have all necessary parts by checking the diagram and parts list If any part is missing or damaged please contact our Customer Service Package Included...

Страница 6: ...p and valve s plane is perpendicular to the ground STEP 3 INSTALL THE VALVE BODY WATER PIPE STEP 4 PIPELINE FLUSHING a Remove the protec ve cover Unscrew the xing screws on the valve body protec ve co...

Страница 7: ...the size of the le hole according to the size and shape of the protec ve cover STEP 7 INSTALL THE HANDLE a Put on the handle then ghten screws b Intall the hot and cold signs Note Hot on the le and co...

Страница 8: ...lnstalla on changes not required Hot Le Hot Right Hot Cold Reverse Installa on b Remove loca ng sleeve c Rotate the valve core 180 d Install the loca ng sleeve e Install the valve core a Remove the v...

Страница 9: ...e cold water temperature is colder than it is during the summer which could result in varying outlet temperatures A water temperature for a comfortable bath or shower is typically between 90 F 110 F P...

Отзывы: