background image

18

Insert a Corner Post (CN1) and a Back and Side Wall Panel

(WP1/WP2) at the rear of the platform.

Insert Wall Support Beams (WSB) into walls during assembly and

mark the location of the Wall Support Beams on the inteior of the shed 

 walls with a pen for reference.

3

WP1

WP2

CN1

WSB

WSB

Insert Wall Support Beams (WSB) into walls as shown and 

mark the location of the Wall Support Beams 

on the inteior of the shed 

walls with a pen for reference.

WP2

WSB

WSB

WSB

WSB

WSB

WSB

WSB

WSB

WSB

WP2

WP2

WP2

WP1

WP1

WP1

WP1

WP1

WSB

Mark should be visible

2” below top of wall.

Continue adding Back and Side Wall 

Panels (WP1/WP2) and Corner Post (CN1).  

Snap panels together and push down into 

the base track.  Ensure all parts are fully seated

4

4

Содержание 73005105

Страница 1: ...T D ASSEMBLER LA REMISE ALL STATED SIZES ARE NOMINAL DIMENSIONS TODAS LAS DIMENSIONES INDICADAS SON NOMINALES TOUTES LES DIMENSIONS INDIQU ES SONT NOMINALES Models Mod les Modelos Version Edici n 1 0...

Страница 2: ...WP3 WP3 WP3 WP3 CN1 CN1 PLEASE TAKE A COMPLETE INVENTORY OF ALL PARTS USING THE PARTS LIST AND PART IDENTIFICATION GUIDE PROVIDED ON PAGES 5 AND 7 DO NOT ATTEMPT TO ASSEMBLE BUILDING IF PARTS ARE MISS...

Страница 3: ...Measuring Tape Min 16 feet 5m Phillips is a registered trademark of PhillipsScrew Co Silicone Caulking Tools Required Materials Needed 7 Wall Cap SC1 Hilti Kwik 3 8 x 5 Bolt WLB 24 pcs Wall Support B...

Страница 4: ...ra construir la base un poco m s ancha que las dimensiones de la base para tener un poco de espacio en el que pueda trabajar Seleccione un sitio que no tenga agua fre tica y cuente con drenaje adecuad...

Страница 5: ...n d querre et que l ouverture de porte mesure 7113 32 po 181 3 cm APPLIQUEZ UN FILET CONTINU DE CALFEUTRAGE DE SILICONE SOUS LES RAILS DE BASE L INT RIEUR DU P RIM TRE DES RAILS ET AUX ENDROITS O SE R...

Страница 6: ...WP1 WP2 CN1 WSB WSB Insert Wall Support Beams WSB into walls as shown and mark the location of the Wall Support Beams on the inteior of the shed walls with a pen for reference WP2 WSB WSB WSB WSB WSB...

Страница 7: ...eior of the shed walls with a pen for reference WP2 WP2 WP2 WP2 WSB WSB WSB WSB Complete the front walls by adding the Corner Posts CN1 Front Wall Panels WP3 and Door Jambs VDJ Ensure all parts are fu...

Страница 8: ...ts muraux SC1 sur les murs lat raux Pour tre en mesure de bien installer les pignons l tape 9 les rives avant et arri re des couvre joints muraux doivent tre au m me niveau aucun surplomb que les rive...

Страница 9: ...po AS3 20 par c t aux endroits o les panneaux muraux entrent en contact avec les autres panneaux muraux les poteaux corniers et la base comme illustr Les vis doivent tre espac es d environ 18 po et e...

Страница 10: ...9 64 drill bit at the wall cap interface and Floor Track Self Tapping screws ST1 10 x 3 4 Self Tapping Vis autotaraudeuse no 10 x 3 4 Tornillo autorroscable 10 x 3 4 Line up screws with marks made St...

Отзывы: