46
Start-up
Make sure that no electricity or similar lines run in
the wall at this location!
•
Use a pen to mark the positions of the four bore
holes on the wall
(see fig. 2)
.
•
Use an appropriate drill to make the 6 mm holes
as illustrated.
•
Use the screws and plugs supplied to fasten the
Multi IO Box
(see fig. 2)
.
6
Start-up
6.1
Installation instructions
Please read this entire section before starting to
install the device.
Please note! Only to be installed by persons
with the relevant electro-technical knowledge
and experience!*
Incorrect installation can put
•
your own life at risk;
•
and the lives of other users of the electrical system.
Incorrect installation also means that you are running the
risk of serious damage to property, e.g. because of a fire.
You may be personally liable in the event of injuries or
damage to property.
Содержание HmIP-MIOB
Страница 3: ...1 A B C D E F G I J H ...
Страница 4: ...2 3 168 mm 93 5 mm ...
Страница 5: ...4 5 ...
Страница 53: ...53 Start up PE 1 1 PE 1 2 L 2 1 L 2 2 N 3 1 N 3 2 1 4 1 1 5 3 L 4 2 2 5 1 L 5 2 N L ...