Wait a day after assembly and verify there are no leaks before starting activation.
Activate the system in warm weather. (average day/night temperature at least 25 °C (77 °F) for the first 4 weeks).
To activate, you will need: 100 liters (25 gallons) of animal manure from herbivores, fresh (wet and up to 2 days old) & clean as possible
from straw/stones/earth. Manure from cows, sheep, goats, horses or pigs can be used. Do not use chicken droppings. The 100 liters can be
fed over a few days if it is difficult to obtain the full amount at once.
activating the system
Depending on the surrounding temperature and the
freshness of the manure, the system will usually begin to
produce gas within one to three weeks after the initial
feeding.
When gas starts being generated in the system, some
liquid will pour out from the fertilizer outlet, and the gas
tank will begin to fill up and expand.
Raise the plunger (rest it on the sink’s plunger slot) and
start gradually filling the sink with slurry.
An equal amount of liquid will pour out from the fertilizer
outlet. You may collect and reuse this water to mix more
slurry to feed into the system.
Mix the 100 liters of animal manure with an equal
amount of water until it creates a consistent slurry (200
liters). If your containers are not large enough to hold all
the slurry, mix and feed it into the system in batches.
The 100 liters can be fed over a few days if it is difficult to
obtain the ful amount at once.
DO NOT
start feeding the system with any
food waste until a st
eady flame can be
produced at your stove.
If you will be using ONLY ANIMAL MANURE with the system:
After the initial 200 liters, continue to feed the system animal manure daily, up to 15 liters per day (15ℓ 30ℓ water = 45ℓ slurry)
Содержание HBG 2.0
Страница 1: ...1 HB2 OM 050221 2021 HOMEBIOGAS VERSION 050221 HBG 2 0 HOUSEHOLD BIOGAS SYSTEM OWNER S MANUAL ...
Страница 13: ...13 i ii iii x4 parts bag 1 i i ii iii LUBRICANT LUBRICANT ...
Страница 15: ...15 1 parts bag LUBRICANT LUBRICANT ...
Страница 16: ...16 x2 Inlet sink orientation short cord plunger slot towards back long cord towards front ...
Страница 18: ...18 pipes must point inwards when filling rest hose on digester enter inlet pipe from opposite side ...
Страница 19: ...19 check filled digester for leaks contact HomeBiogas if any leaks are seen ...
Страница 20: ...20 ii i LUBRICANT x2 ...
Страница 21: ...21 i ii iii v iv 90 ...
Страница 22: ...22 x40 i ii iii use dry sand only sand bags ...
Страница 23: ...23 2 top x16 left right x16 back front x8 1 2 3 x2 x8 x8 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 ...
Страница 24: ...24 iii ii GAS FILTER i remove 2 protective stickers from cover base of gas filter ...
Страница 29: ...29 ...
Страница 37: ...37 ...
Страница 43: ...43 ...
Страница 47: ...47 ...
Страница 48: ...48 HB2 OM 050221 2021 HOMEBIOGAS ...