
12
Operating Instructions
TOP RAIL ASSEMBLY (ONLY USED FOR 8K)
The top rail must be assembled prior to installing the air
conditioner in the window.
Tools Needed:
Phillips Screw Driver
Top Rail Hardware
QTY
3/8”
Screw
4
Top
Rail
1
Attaching the Top Rail to the Air Conditioner
1. Remove the air conditioner from the box and place on a
hard flat surface.
2. Remove top rail from the bottom of the packaging
material as shown in FIG. A.
3. Align the hole in the top rail with those in the top of the
unit as shown in FIG. B.
4. Secure the top rail to the unit with the 3/8” screws as
shown in FIG. C.
CAUTION:
When handling the unit, be careful to avoid cuts from the sharp
metal edges and aluminum fins on the front and rear coils.
MOUNTING HARDWARE
3/4” Screws
1/2” Screws
Lock Frame
Sash Lock
4
3
2
1
TOOLS NEEDED:
• Phillips Screw Driver
• Drill (If pilot holes are needed)
CAUTION:
When handling the unit, be careful to avoid cuts from the sharp
metal edges and aluminum fins on the front and rear coils.
NOTE:
For safety reasons, all 4 screws must
be used to attach the top rail.