3. Installation notes
1) Installation must be completed by a qualified person.
2) Dispose of all packaging in a responsible manner.
3) For installation, ensure the wall can hold the weight of this product. A
brick or cinderblock type wall is suitable.
4) This product is for indoors only.
5) Use a tape measure to insure there is enough space to fit this prod-
uct.
4. Towel rail installation:
- Read instructions carefully before installation.
- Installation must be completed by a qualified person.
- Dispose of all packaging in a responsible manner.
Tools required